Off-Location Flowlines |
Facility ID: 457418 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 083020181 | Start Location ID: 333198 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 3/9/2000 |
| |
Facility ID: 463592 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 327201907 | Start Location ID: 336482 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/17/2001 |
| |
Facility ID: 463591 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 327201905 | Start Location ID: 333125 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 6/6/2002 |
| |
Facility ID: 462370 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 011420182 | Start Location ID: 327394 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 5/10/1991 |
| |
Facility ID: 463590 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 327201906 | Start Location ID: 311420 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 2/16/1999 |
| |
Facility ID: 457419 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 083020182 | Start Location ID: 336465 | Location: SWSE 192N 66W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 5/22/2002 |
| |
Facility ID: 463589 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: CL |
Operator Flowline ID: 327201904 | Start Location ID: 327394 | Location: NENE 192N 66W |
Flowline Type: Production Line | Fluid Type: | Pipe Material: Carbon Steel | Construction Date: 6/6/2002 |
| |