Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47699
Well Classification: OW Status: PR - 7/31/2019
Well Name/No:Bost Farm #41N-8A-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/31/2019
FacilityID:456993LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1437FNL  940 FWLLat/Long: 40.417592 / -104.829013Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417591 / -104.829013Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/23/2019
End Date: 4/3/2019
Reported: 6/4/2019
Days to report: 62
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/31/2019             Measured TD: 17515 ft.    Vertical TD: 7121 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/31/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 1691 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 1651 FNL  460 FEL
Proposed Depth/Form:17332 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17332 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2126, Top: , Bottom: 17332 ft.

Wellbore Completed
Completion Date:12/20/2018
Spud Date:10/7/2018Spud Date Is:ACTUAL
Measured TD:17515 ft.Measured PB depth:17394 ft.
True Vertical TD:7121 ft.True Vertical PB depth:7121 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 1699 FNL  171 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 1641 FNL  396 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 36 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1789 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: 0 ft., Bottom: 1789 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17479 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2373, Top: 754 ft., Bottom: 17389 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3705 ft.NN
SUSSEX4241 ft.NN
SHANNON4833 ft.NN
SHARON SPRINGS7177 ft.NN
NIOBRARA7259 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/31/2019                 Interval Top: 7472 ft.    Interval Bottom: 17324 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/22/2019Treatment End Date:4/3/2019
Treatment Summary:Plug and perf completion type, 49 stages. 305878 bbl of slickwater and gel. 1293 bbl of 15% HCL acid used. 17169908 lbs proppant: 294010 lbs of 100 mesh, 16875898 lbs 20/40.
Total fluid used in treatment (bbls):307171Max pressure during treatment (psi):8315
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1293Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4455
Fresh water used in treatment (bbls):305878Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17169908Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7085 ft.
Tubing Packer Depth:7064 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 302
BBLS_OIL 377
BTU_GAS 1000
CALC_BBLS_H2O 302
CALC_BBLS_OIL 337
CALC_GOR 2989
CALC_MCF_GAS 1127
CASING_PRESS 1104
GRAVITY_OIL 49
MCF_GAS 1127
TUBING_PRESS 2150
Perforation Data:
Interval Top:7472 ft.# Of Holes:1764
Interval Bottom:17324 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9640
Total Gas Produced (MCF)119296
GOR12375
GOR DeterminationBOE
Average BOE per Day83.025
Average MCFE per Day481.564

 Federal Financial Assurance  i 

 Tribal Well  i No