Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47370
Well Classification: OW Status: PR - 7/1/2025
Well Name/No:Postle IC #09-182HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2025
FacilityID:456129LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1554FNL  556 FWLLat/Long: 40.243708 / -104.977789Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243708 / -104.977787Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/16/2020
End Date: 11/28/2020
Reported: 12/22/2020
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2025             Measured TD: 18571 ft.    Vertical TD: 7233 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 2590 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 2590 FNL  274 FWL
Proposed Depth/Form:18417 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18417 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2373, Top: , Bottom: 18417 ft.

Wellbore Completed
Completion Date:4/28/2020
Spud Date:1/30/2020Spud Date Is:ACTUAL
Measured TD:18571 ft.Measured PB depth:18554 ft.
True Vertical TD:7233 ft.True Vertical PB depth:7233 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 2590 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 2590 FNL  274 FWL
Log Types:Mud log, Composite, MWD/LWD, CBL, (IND/GR in 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1552 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18571 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2595, Top: 3580 ft., Bottom: 18571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3651 ft.3705 ft.NN
SUSSEX4111 ft.4242 ft.NN
SHANNON4626 ft.4659 ft.NN
SHARON SPRINGS7202 ft.NN
NIOBRARA7299 ft.NN
FORT HAYS7782 ft.NN
CODELL7901 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 15546 ft.    Interval Bottom: 15996 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/1/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval; 15546' - 15996'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15546 ft.# Of Holes:1032
Interval Bottom:15996 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 10480 ft.    Interval Bottom: 11011 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2021Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval; 10480' - 11011'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10480 ft.# Of Holes:1032
Interval Bottom:11011 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 8332 ft.    Interval Bottom: 18322 ft.

 Completed Information for Formation CODELL
1st Production Date:2/1/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval; 8332' - 9211'; 9386' - 9753'; 11221' - 15083'; 15155' - 15545'; 15997' - 17017'; 17401' - 18322'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8332 ft.# Of Holes:1032
Interval Bottom:18322 ft.Hole Size:0.34 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/3/2024                 Interval Top: 8020 ft.    Interval Bottom: 17400 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/1/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval; 8020' - 8331'; 9212' - 9385'; 9754' - 10479'; 11012' - 11220'; 15084' - 15154'; 17018' - 17400'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8020 ft.# Of Holes:1032
Interval Bottom:17400 ft.Hole Size:0.34 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 7/1/2025                  Interval Top: 8020 ft.    Interval Bottom: 18322 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:2/1/2021Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/16/2020Treatment End Date:11/28/2020
Treatment Summary:71 bbls 15% HCL Acid; 479,099 # 100 Mesh Sand; 7,285,456 # 20/40 Sand; 149,578 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):149649Max pressure during treatment (psi):4162
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):37254
Fresh water used in treatment (bbls):149578Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7764555Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7225 ft.
Tubing Packer Depth:7207 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 408
BBLS_OIL 310
BTU_GAS 1352
CALC_BBLS_H2O 408
CALC_BBLS_OIL 310
CALC_GOR 1884
CALC_MCF_GAS 584
CASING_PRESS 2
GRAVITY_OIL 46
MCF_GAS 584
TUBING_PRESS 1410
Perforation Data:
Interval Top:8020 ft.# Of Holes:1032
Interval Bottom:18322 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)592
Total Gas Produced (MCF)15024
GOR25378
GOR DeterminationMCFE
Average BOE per Day8.660
Average MCFE per Day50.205

 Federal Financial Assurance  i 

 Tribal Well  i No