Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46994
Well Classification: OW Status: PR - 3/1/2024
Well Name/No:Sack KE #21-242HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2024
FacilityID:455341LocationID:446474
County:WELD #123Location:SWSW 21 1N66W 6
Field:WATTENBERG - #90750Elevation:5018 ft.
Planned Location:772FSL  359 FWLLat/Long: 40.031553 / -104.790185Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.031554 / -104.790184Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/19/2018
End Date: 8/29/2018
Reported: 9/13/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2024             Measured TD: 12524 ft.    Vertical TD: 7598 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/8/2020
Proposed Top PZ Location:Sec:21 Twp: 1N 66W Footage: 2060 FSL  590 FWL
Bottom Hole Location:Sec:21 Twp: 1N 66W Footage: 2086 FSL  384 FEL
Proposed Depth/Form:12335 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1709 , Unit Acreage: 320, Drill Unit: Sec. 21: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12630 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1088, Top: , Bottom: 12630 ft.

Wellbore Completed
Completion Date:7/25/2018
Spud Date:7/2/2018Spud Date Is:ACTUAL
Measured TD:12524 ft.Measured PB depth:12515 ft.
True Vertical TD:7598 ft.True Vertical PB depth:7598 ft.
Top PZ Location:Sec:21 Twp: 1N 66WFootage: 2060 FSL  590 FWL
Bottom Hole Location:Sec:21 Twp: 1N 66WFootage: 2086 S  384 E
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1523 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 619, Top: 0 ft., Bottom: 1523 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12524 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1212, Top: 4140 ft., Bottom: 12524 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4399 ft.NN
SUSSEX4777 ft.NN
SHANNON5763 ft.NN
SHARON SPRINGS7341 ft.NN
NIOBRARA7489 ft.NN
FORT HAYS8069 ft.NN
CODELL8157 ft.NN
CARLILE8672 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/6/2019                 Interval Top: 10856 ft.    Interval Bottom: 11003 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/18/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Fort Hayes perforation intervals: 10856'-11003'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10856 ft.# Of Holes:630
Interval Bottom:11003 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 9584 ft.    Interval Bottom: 10193 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/18/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Niobrara perforation interval: 9584'-10193'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9584 ft.# Of Holes:630
Interval Bottom:10193 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 8672 ft.    Interval Bottom: 11206 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/18/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Carlile perforation interval: 8672'-8953', 11004'-11206'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8672 ft.# Of Holes:630
Interval Bottom:11206 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 8251 ft.    Interval Bottom: 12395 ft.

 Completed Information for Formation CODELL
1st Production Date:9/18/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Codell perforation intervals: 8251' - 8671', 8954'-9583', 10194'-10855', 11207-12395'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8251 ft.# Of Holes:630
Interval Bottom:12395 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/1/2024                  Interval Top: 8251 ft.    Interval Bottom: 12395 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/18/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/19/2018Treatment End Date:8/29/2018
Treatment Summary:233,133# 100 Mesh Sand; 3,984,741# 20/40 Sand; 67,610 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):67610Max pressure during treatment (psi):3856
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9745
Fresh water used in treatment (bbls):67610Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4217874Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7913 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 359
BBLS_OIL 234
BTU_GAS 1362
CALC_BBLS_H2O 359
CALC_BBLS_OIL 234
CALC_GOR 722
CALC_MCF_GAS 169
CASING_PRESS 2200
GRAVITY_OIL 44
MCF_GAS 169
TUBING_PRESS 1710
Perforation Data:
Interval Top:8251 ft.# Of Holes:630
Interval Bottom:12395 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1060
Total Gas Produced (MCF)3868
GOR3649
GOR DeterminationBOE
Average BOE per Day4.714
Average MCFE per Day27.336

 Federal Financial Assurance  i 

 Tribal Well  i No