Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46688
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:J Clark #1C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:454696LocationID:323242
County:WELD #123Location:NWNE 14 5N65W 6
Field:WATTENBERG - #90750Elevation:4617 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:550FNL  2249 FELLat/Long: 40.405174 / -104.629159Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.405170 / -104.629160Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/1/2018
End Date: 11/6/2018
Reported: 2/1/2022
Originally Reported: 11/21/2018
Days to report: 1183
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 12704 ft.    Vertical TD: 6901 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/4/2020
Proposed Top PZ Location:Sec:14 Twp: 5N 65W Footage: 18 FNL  290 FWL
Bottom Hole Location:Sec:11 Twp: 5N 65W Footage: 561 FNL  298 FWL
Proposed Depth/Form:12859 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12859 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 12859 ft.

Wellbore Completed
Completion Date:8/31/2018
Spud Date:8/24/2018Spud Date Is:ACTUAL
Measured TD:12704 ft.Measured PB depth:12244 ft.
True Vertical TD:6901 ft.True Vertical PB depth:6901 ft.
Top PZ Location:Sec:14 Twp: 5N 65WFootage: 18 FNL  290 FWL
Bottom Hole Location:Sec:11 Twp: 5N 65WFootage: 561 FNL  298 FWL
Log Types:CBL, MWD (DIL in 123-12759)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1678 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12259 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1600, Top: 4220 ft., Bottom: 12259 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 12259 ft., Depth: 12704 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3800 ft.
SUSSEX4566 ft.
SHANNON5259 ft.
SHARON SPRINGS7114 ft.
NIOBRARA7178 ft.
FORT HAYS7751 ft.
CODELL7877 ft.
CARLILE10630 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/4/2019                 Interval Top: 11222 ft.    Interval Bottom: 11771 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/4/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 11,222'-11,552', 11,691'-11,771',
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11222 ft.# Of Holes:864
Interval Bottom:11771 ft.Hole Size:0.42 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/4/2019                 Interval Top: 10630 ft.    Interval Bottom: 10639 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/4/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,630'-10,639'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10630 ft.# Of Holes:864
Interval Bottom:10639 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 12/1/2025                 Interval Top: 7881 ft.    Interval Bottom: 12259 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/18/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2018Treatment End Date:11/6/2018
Treatment Summary:25 Stage Plug and Perf Total Fluid: 73,243 bbls Gel Fluid: 47,972 bbls Slickwater Fluid: 24,680 bbls 15% HCl Acid: 591 bbls Total Proppant: 3,563,500 lbs Silica Proppant: 3,563,500 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):73243Max pressure during treatment (psi):4435
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):591Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4740
Fresh water used in treatment (bbls):72652Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3563500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7488 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/21/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 111
BBLS_OIL 321
BTU_GAS 1251
CALC_BBLS_H2O 111
CALC_BBLS_OIL 321
CALC_GOR 2988
CALC_MCF_GAS 959
CASING_PRESS 2418
GRAVITY_OIL 47
MCF_GAS 959
TUBING_PRESS 1516
Perforation Data:
Interval Top:7881 ft.# Of Holes:864
Interval Bottom:12259 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/4/2019                 Interval Top: 7881 ft.    Interval Bottom: 12259 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/4/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,881'-10,630', 10,639'-11,222', 11,552'-11,691', 11,771'-12,259'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7881 ft.# Of Holes:864
Interval Bottom:12259 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)2517
GOR30695
GOR DeterminationMCFE
Average BOE per Day1.428
Average MCFE per Day8.265

 Federal Financial Assurance  i 

 Tribal Well  i No