Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46568
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Ruegge #3R-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:454449LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4914 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:717FSL  2205 FWLLat/Long: 40.075285 / -104.670526Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075276 / -104.670520Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/3/2018
End Date: 9/13/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 267
Days to report: 188
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 12660 ft.    Vertical TD: 7215 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 455 FSL  214 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 465 FNL  221 FEL
Proposed Depth/Form:12745 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2546 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 976, Top: 0 ft., Bottom: 2546 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12745 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1738, Top: , Bottom: 12745 ft.

Wellbore Completed
Completion Date:7/30/2018
Spud Date:5/18/2018Spud Date Is:ACTUAL
Measured TD:12660 ft.Measured PB depth:12617 ft.
True Vertical TD:7215 ft.True Vertical PB depth:7218 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 455 FSL  214 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 465 FNL  221 FEL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2563 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 976, Top: 0 ft., Bottom: 2695 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12640 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1689, Top: 3059 ft., Bottom: 12660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4758 ft.NN
SHANNON5603 ft.NN
TEEPEE BUTTES6769 ft.NN
SHARON SPRINGS7524 ft.NN
NIOBRARA7555 ft.NN
FORT HAYS8214 ft.NN
CODELL8421 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/23/2020                 Interval Top: 8421 ft.    Interval Bottom: 11786 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2020Treatment End Date:N/A
Treatment Summary:Codell: 8421'-11786'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8421 ft.# Of Holes:336
Interval Bottom:11786 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2025                 Interval Top: 8261 ft.    Interval Bottom: 12614 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/10/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2018Treatment End Date:9/13/2018
Treatment Summary:93198 bbls of water, 85 bbls of additives (FRP-4CS, PLEXSLICK 986C, ACI-97, ASF-67) and 12 bbl HCL in a 15 stage frac with 2286380 lbs of silica quartz proppant
Total fluid used in treatment (bbls):93295Max pressure during treatment (psi):8979
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9957
Fresh water used in treatment (bbls):93283Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2286380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 379
BBLS_OIL 501
BTU_GAS 1322
CALC_BBLS_H2O 379
CALC_BBLS_OIL 501
CALC_GOR 1232
CALC_MCF_GAS 617
CASING_PRESS 2320
GRAVITY_OIL 43
MCF_GAS 617
TUBING_PRESS 1150
Perforation Data:
Interval Top:8261 ft.# Of Holes:336
Interval Bottom:12614 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/23/2020                 Interval Top: 8261 ft.    Interval Bottom: 12614 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2020Treatment End Date:N/A
Treatment Summary:8261'-8420', 11787'-12614'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8261 ft.# Of Holes:336
Interval Bottom:12614 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No