Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45987
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:Coyote Trails #34S-20-15N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453227LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Planned Location:1145FSL  2049 FELLat/Long: 40.017973 / -105.006382Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017973 / -105.006381Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2018
End Date: 6/5/2018
Reported: 6/25/2018
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 19495 ft.    Vertical TD: 8170 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Prop Depth/Form:19235 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19235 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2584, Top: 1500 ft., Bottom: 19235 ft.

Wellbore Completed
Completion Date:3/20/2018
Spud Date:2/4/2018Spud Date Is:ACTUAL
Measured TD:19495 ft.Measured PB depth:19488 ft.
True Vertical TD:8170 ft.True Vertical PB depth:8170 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 479 FNL  2051 FWLDepth
Bottom Hole Location:Sec:3 Twp: 1S 68WFootage: 191 FSL  1638 FWLDepth
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1606 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 1606 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19488 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3065, Top: 1360 ft., Bottom: 19488 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5449 ft.NN
SUSSEX5960 ft.NN
SHANNON6579 ft.NN
SHARON SPRINGS9017 ft.NN
NIOBRARA9059 ft.NN
FORT HAYS9586 ft.NN
CODELL9674 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/24/2018                Interval Top: 13533 ft.    Interval Bottom: 16193 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/30/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Producing Intervals: 13533'-13979'; 15831-16193'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13533 ft.# Of Holes:140
Interval Bottom:16193 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/1/2023                  Interval Top: 9870 ft.    Interval Bottom: 19385 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:9/30/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Frac'd Codell-Fort Hays with 49-stage plug-and-perf; 9799900 total proppant pumped: 30/50 mesh sand; 20142 total bbls fluid pumped: 20130 bbls fresh water and 12 bbls 15% HCL acid.
Total fluid used in treatment (bbls):20142Max pressure during treatment (psi):8309
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):33128
Fresh water used in treatment (bbls):20130Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9799900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9716 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 192
BBLS_OIL 652
BTU_GAS 1530
CALC_BBLS_H2O 192
CALC_BBLS_OIL 652
CALC_GOR 2451
CALC_MCF_GAS 1598
CASING_PRESS 2744
GRAVITY_OIL 46
MCF_GAS 1598
TUBING_PRESS 1740
Perforation Data:
Interval Top:9870 ft.# Of Holes:1537
Interval Bottom:19385 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/24/2018                Interval Top: 9870 ft.    Interval Bottom: 19385 ft.

 Completed Information for Formation CODELL
1st Production Date:9/30/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Producing Intervals: 9870'-13510'; 14000'-15797'; 16230'-19385'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9870 ft.# Of Holes:1397
Interval Bottom:19385 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)4175
Total Gas Produced (MCF)119590
GOR28644
GOR DeterminationMCFE
Average BOE per Day67.729
Average MCFE per Day392.843

 Federal Financial Assurance  i 

 Tribal Well  i No