|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/12/2021 Measured TD: 13504 ft. Vertical TD: 7836 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/12/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/20/2019 | Proposed Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 41 FNL 1018 FWL | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 51 FSL 1008 FWL | Proposed Depth/Form: | 13462 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13452 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1579, Top: , Bottom: 13452 ft. |
| | |
Wellbore Completed | Completion Date: | 1/30/2018 | Spud Date: | 11/17/2017 | Spud Date Is: | ACTUAL | Measured TD: | 13504 ft. | Measured PB depth: | 13490 ft. | True Vertical TD: | 7836 ft. | True Vertical PB depth: | 7837 ft. | Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 41 FNL 1018 FWL | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 51 FSL 1008 FWL | Log Types: | GR, CBL, CNL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1865 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 703, Top: 0 ft., Bottom: 1875 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13494 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1290, Top: 1040 ft., Bottom: 13504 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4268 ft. | | | | SUSSEX | 4708 ft. | | | | SHANNON | 5232 ft. | | | | SHARON SPRINGS | 7553 ft. | | | | NIOBRARA | 7605 ft. | | | | FORT HAYS | 8250 ft. | | | | CODELL | 8704 ft. | | | | CARLILE | 10749 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 10749 ft. Interval Bottom: 11529 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | Treatment Summary: | 10749-11529 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10749 ft. | # Of Holes: | 300 | Interval Bottom: | 11529 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 8681 ft. Interval Bottom: 13466 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | Treatment Summary: | 8681-10418, 11529-13466 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8681 ft. | # Of Holes: | 300 | Interval Bottom: | 13466 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 5/12/2021 Interval Top: 8337 ft. Interval Bottom: 13466 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 4/20/2021 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 3/27/2021 | Treatment End Date: | 3/30/2021 | Treatment Summary: | PERF FROM 8337-13466
2,574 BBLS PUMP DOWN; 128,814 BBLS SLICKWATER; 131,388 BBLS TOTAL FLUID. 2,037,014 LBS WHITE 30/50 OTTAWA/ST. PETERS; 797,287 LBS WHITE 40/70 OTTAWA/ST. PETERS; 2,834,301 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 131388 | Max pressure during treatment (psi): | 8039 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 131388 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2834301 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7830 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/12/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 214 | BBLS_OIL | 73 | BTU_GAS | 1258 | CALC_BBLS_H2O | 214 | CALC_BBLS_OIL | 73 | CALC_GOR | 2548 | CALC_MCF_GAS | 186 | CASING_PRESS | 2400 | GRAVITY_OIL | 49 | MCF_GAS | 186 | TUBING_PRESS | 1700 |
| Perforation Data: | Interval Top: | 8337 ft. | # Of Holes: | 300 | Interval Bottom: | 13466 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 8337 ft. Interval Bottom: 10749 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | Treatment Summary: | 8337-8681, 10418-10749 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8337 ft. | # Of Holes: | 300 | Interval Bottom: | 10749 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5358 |
Total Gas Produced (MCF) | 44979 |
GOR | 8394 |
GOR Determination | BOE |
Average BOE per Day | 35.931 |
Average MCFE per Day | 208.385 |
Federal Financial Assurance | i | |
|
|