Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45451
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Wilson IC #03-302HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:452194LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4986 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1276FNL  615 FWLLat/Long: 40.259347 / -104.958544Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259349 / -104.958546Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2019
End Date: 7/21/2019
Reported: 8/9/2019
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 18350 ft.    Vertical TD: 7350 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 1242 FSL  515 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 1259 FSL  233 FWL
Proposed Depth/Form:18031 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18131 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2308, Top: 0 ft., Bottom: 18131 ft.

Wellbore Completed
Completion Date:3/20/2019
Spud Date:2/4/2019Spud Date Is:ACTUAL
Measured TD:18350 ft.Measured PB depth:18339 ft.
True Vertical TD:7350 ft.True Vertical PB depth:7350 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 1242 FSL  515 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 1259 FSL  233 FWL
Log Types:Composite, Mud, MWD/LWD, CBL, Tracer Survey (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1591 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1591 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18350 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2076, Top: 2872 ft., Bottom: 18350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3874 ft.3921 ft.NN
SUSSEX4404 ft.4573 ft.NN
SHANNON4992 ft.5031 ft.NN
SHARON SPRINGS7577 ft.NN
NIOBRARA7752 ft.NN
FORT HAYS8218 ft.NN
CODELL8286 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/28/2020                 Interval Top: 17641 ft.    Interval Bottom: 17925 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/28/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Intervals: 17641-17925
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:17641 ft.# Of Holes:1440
Interval Bottom:17925 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 16572 ft.    Interval Bottom: 17640 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/28/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Intervals: 16572-17640
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:16572 ft.# Of Holes:1440
Interval Bottom:17640 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 8507 ft.    Interval Bottom: 18059 ft.

 Completed Information for Formation CODELL
1st Production Date:8/28/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Intervals: 8507-16571, 17926-18059
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8507 ft.# Of Holes:1440
Interval Bottom:18059 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 8/1/2024                  Interval Top: 8507 ft.    Interval Bottom: 18059 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:8/28/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2019Treatment End Date:7/21/2019
Treatment Summary:480,090# 100 Mesh Sand; 9,111,912# 20/40 Sand; 170,209 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):170209Max pressure during treatment (psi):4711
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):30772
Fresh water used in treatment (bbls):170209Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9592002Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8120 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 602
BBLS_OIL 543
BTU_GAS 1393
CALC_BBLS_H2O 602
CALC_BBLS_OIL 543
CALC_GOR 1195
CALC_MCF_GAS 649
CASING_PRESS 1750
GRAVITY_OIL 46
MCF_GAS 649
TUBING_PRESS 1250
Perforation Data:
Interval Top:8507 ft.# Of Holes:1440
Interval Bottom:18059 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)2652
Total Gas Produced (MCF)12184
GOR4594
GOR DeterminationBOE
Average BOE per Day13.017
Average MCFE per Day75.493

 Federal Financial Assurance  i 

 Tribal Well  i No