Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45451
Well Classification: OW Status: PR - 1/1/2026
Well Name/No:Wilson IC #03-302HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:452194LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4986 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1276FNL  615 FWLLat/Long: 40.259347 / -104.958544Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259349 / -104.958546Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2019
End Date: 7/21/2019
Reported: 8/9/2019
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2026             Measured TD: 18350 ft.    Vertical TD: 7350 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 1242 FSL  515 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 1259 FSL  233 FWL
Proposed Depth/Form:18031 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18131 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2308, Top: 0 ft., Bottom: 18131 ft.

Wellbore Completed
Completion Date:3/20/2019
Spud Date:2/4/2019Spud Date Is:ACTUAL
Measured TD:18350 ft.Measured PB depth:18339 ft.
True Vertical TD:7350 ft.True Vertical PB depth:7350 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 1242 FSL  515 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 1259 FSL  233 FWL
Log Types:Composite, Mud, MWD/LWD, CBL, Tracer Survey (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1591 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1591 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18350 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2076, Top: 2872 ft., Bottom: 18350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3874 ft.3921 ft.NN
SUSSEX4404 ft.4573 ft.NN
SHANNON4992 ft.5031 ft.NN
SHARON SPRINGS7577 ft.NN
NIOBRARA7752 ft.NN
FORT HAYS8218 ft.NN
CODELL8286 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/28/2020                 Interval Top: 17641 ft.    Interval Bottom: 17925 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/28/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Intervals: 17641-17925
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:17641 ft.# Of Holes:1440
Interval Bottom:17925 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 16572 ft.    Interval Bottom: 17640 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/28/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Intervals: 16572-17640
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:16572 ft.# Of Holes:1440
Interval Bottom:17640 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/28/2020                 Interval Top: 8507 ft.    Interval Bottom: 18059 ft.

 Completed Information for Formation CODELL
1st Production Date:8/28/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/28/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Intervals: 8507-16571, 17926-18059
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8507 ft.# Of Holes:1440
Interval Bottom:18059 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/1/2026                  Interval Top: 8507 ft.    Interval Bottom: 18059 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:8/28/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2019Treatment End Date:7/21/2019
Treatment Summary:480,090# 100 Mesh Sand; 9,111,912# 20/40 Sand; 170,209 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):170209Max pressure during treatment (psi):4711
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):30772
Fresh water used in treatment (bbls):170209Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9592002Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8120 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 602
BBLS_OIL 543
BTU_GAS 1393
CALC_BBLS_H2O 602
CALC_BBLS_OIL 543
CALC_GOR 1195
CALC_MCF_GAS 649
CASING_PRESS 1750
GRAVITY_OIL 46
MCF_GAS 649
TUBING_PRESS 1250
Perforation Data:
Interval Top:8507 ft.# Of Holes:1440
Interval Bottom:18059 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2891
Total Gas Produced (MCF)17548
GOR6069
GOR DeterminationBOE
Average BOE per Day16.158
Average MCFE per Day93.711

 Federal Financial Assurance  i 

 Tribal Well  i No