Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45432
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Wilson IC #03-022HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:452174LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4987 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1176FNL  555 FWLLat/Long: 40.259622 / -104.958758Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259624 / -104.958757Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/28/2018
End Date: 8/10/2018
Reported: 8/20/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 17470 ft.    Vertical TD: 7331 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 528 FNL  640 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 553 FNL  514 FWL
Proposed Depth/Form:17475 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17575 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2244, Top: , Bottom: 17575 ft.

Wellbore Completed
Completion Date:6/4/2018
Spud Date:4/12/2018Spud Date Is:ACTUAL
Measured TD:17470 ft.Measured PB depth:17462 ft.
True Vertical TD:7331 ft.True Vertical PB depth:7331 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 528 FNL  640 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 553 FNL  514 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API # 05-123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1530 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 1530 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17470 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2270, Top: 2900 ft., Bottom: 17470 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3689 ft.3736 ft.NN
SUSSEX4133 ft.4282 ft.NN
SHANNON4639 ft.4672 ft.NN
SHARON SPRINGS7012 ft.NN
NIOBRARA7168 ft.NN
FORT HAYS7647 ft.NN
CODELL7741 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/27/2020                 Interval Top: 14711 ft.    Interval Bottom: 15561 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/27/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/27/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 14711-15561
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14711 ft.# Of Holes:1410
Interval Bottom:15561 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/1/2024                  Interval Top: 8027 ft.    Interval Bottom: 17379 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:9/27/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/28/2018Treatment End Date:8/10/2018
Treatment Summary:556,667 lbs 100 Mesh Sand; 8,856,212 lbs 20/40 Sand; 160,739 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):160739Max pressure during treatment (psi):4987
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12698
Fresh water used in treatment (bbls):160739Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9412879Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7526 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/29/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 398
BBLS_OIL 500
BTU_GAS 1272
CALC_BBLS_H2O 398
CALC_BBLS_OIL 500
CALC_GOR 1528
CALC_MCF_GAS 764
CASING_PRESS 2416
GRAVITY_OIL 44
MCF_GAS 764
TUBING_PRESS 1896
Perforation Data:
Interval Top:8027 ft.# Of Holes:1410
Interval Bottom:17379 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/27/2020                 Interval Top: 8027 ft.    Interval Bottom: 17379 ft.

 Completed Information for Formation CODELL
1st Production Date:9/27/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/27/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8027-14710, 15562-17379
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8027 ft.# Of Holes:1410
Interval Bottom:17379 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)10075
Total Gas Produced (MCF)2775
GOR275
GOR DeterminationBOE
Average BOE per Day29.157
Average MCFE per Day169.118

 Federal Financial Assurance  i 

 Tribal Well  i No