Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44988
Well Classification: OW Status: PR - 8/1/2019
Well Name/No:Raindance FD #20-359HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2019
FacilityID:451098LocationID:427917
Municipality/County:WINDSOR / WELD #123Location:NENE 30 6N67W 6
Field:WATTENBERG - #90750Elevation:4784 ft.
Planned Location:784FNL  277 FELLat/Long: 40.462833 / -104.927456Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.462835 / -104.927458Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/25/2017
End Date: 12/9/2017
Reported: 1/9/2018
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2019             Measured TD: 12531 ft.    Vertical TD: 7195 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/13/2019
Proposed Top PZ Location:Sec:20 Twp: 6N 67W Footage: 707 FSL  175 FWL
Bottom Hole Location:Sec:20 Twp: 6N 67W Footage: 705 FSL  472 FEL
Proposed Depth/Form:12516 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 397, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12516 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1529, Top: 0 ft., Bottom: 12516 ft.

Wellbore Completed
Completion Date:8/9/2017
Spud Date:7/18/2017Spud Date Is:ACTUAL
Measured TD:12531 ft.Measured PB depth:12522 ft.
True Vertical TD:7195 ft.True Vertical PB depth:7195 ft.
Top PZ Location:Sec:20 Twp: 6N 67WFootage: 707 FSL  175 FWL
Bottom Hole Location:Sec:20 Twp: 6N 67WFootage: 705 S  472 E
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1557 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 687, Top: 0 ft., Bottom: 1557 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12531 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1979, Top: 5466 ft., Bottom: 12531 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3427 ft.3742 ft.NN
SUSSEX3956 ft.4186 ft.NN
SHANNON4508 ft.4597 ft.NN
SHARON SPRINGS7025 ft.NN
NIOBRARA7145 ft.NN
FORT HAYS7648 ft.NN
CODELL7729 ft.NN
CARLILE8354 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 11234 ft.    Interval Bottom: 11272 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/9/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/25/2017Treatment End Date:12/9/2017
Treatment Summary:Fort Hays Perf Interval: 11234' - 11272'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11234 ft.# Of Holes:690
Interval Bottom:11272 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 8354 ft.    Interval Bottom: 8791 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/9/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 8354' - 8791'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8354 ft.# Of Holes:690
Interval Bottom:8791 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/1/2019                  Interval Top: 7950 ft.    Interval Bottom: 12442 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/9/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/25/2017Treatment End Date:12/9/2017
Treatment Summary:270,925 lbs 100 Mesh Sand; 4,346,811 lbs 20/40 Sand; 82,120 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):82120Max pressure during treatment (psi):4449
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7327
Fresh water used in treatment (bbls):82120Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4617736Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:7499 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 63
BBLS_OIL 353
BTU_GAS 1342
CALC_BBLS_H2O 63
CALC_BBLS_OIL 353
CALC_GOR 1011
CALC_MCF_GAS 357
CASING_PRESS 1606
GRAVITY_OIL 41
MCF_GAS 357
TUBING_PRESS 1589
Perforation Data:
Interval Top:7950 ft.# Of Holes:690
Interval Bottom:12442 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 7950 ft.    Interval Bottom: 12442 ft.

 Completed Information for Formation CODELL
1st Production Date:2/9/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/25/2017Treatment End Date:12/9/2017
Treatment Summary:Codell Perf Intevral: 7950' - 8353', 8792' - 11233', 11273' - 12442'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7950 ft.# Of Holes:690
Interval Bottom:12442 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)4514
Total Gas Produced (MCF)37810
GOR8376
GOR DeterminationBOE
Average BOE per Day30.182
Average MCFE per Day175.041

 Federal Financial Assurance  i 

 Tribal Well  i No