Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44434
Well Classification: OW Status: PR - 5/1/2024
Well Name/No:North Platte #J14-F11-23HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2024
FacilityID:449661LocationID:432395
County:WELD #123Location:NWNW 26 5N63W 6
Field:WATTENBERG - #90750Elevation:4566 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:336FNL  1080 FWLLat/Long: 40.376567 / -104.408559Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.376568 / -104.408569Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/5/2017
End Date: 12/6/2017
Reported: 2/2/2018
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2024             Measured TD: 11212 ft.    Vertical TD: 6541 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/16/2019
Proposed Top PZ Location:Sec:23 Twp: 5N 63W Footage: 462 FSL  908 FWL
Bottom Hole Location:Sec:23 Twp: 5N 63W Footage: 464 FNL  906 FWL
Proposed Depth/Form:11241 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1793 , Unit Acreage: 640, Drill Unit: All, S. 23
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 894, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 11171 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1602, Top: 1500 ft., Bottom: 11171 ft.

Wellbore Completed
Completion Date:9/25/2017
Spud Date:9/17/2017Spud Date Is:ACTUAL
Measured TD:11212 ft.Measured PB depth:11162 ft.
True Vertical TD:6541 ft.True Vertical PB depth:6542 ft.
Top PZ Location:Sec:23 Twp: 5N 63WFootage: 462 FSL  908 FWL
Bottom Hole Location:Sec:23 Twp: 5N 63WFootage: 464 FNL  906 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 123-45097).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1669 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 903, Top: 0 ft., Bottom: 1679 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11166 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1713, Top: 32 ft., Bottom: 11212 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3364 ft.
SHARON SPRINGS6179 ft.
NIOBRARA6327 ft.
FORT HAYS6637 ft.
CODELL6712 ft.
CARLILE6786 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/16/2020                 Interval Top: 10901 ft.    Interval Bottom: 11111 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/17/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/27/2017Treatment End Date:12/6/2017
Treatment Summary:Perforated Intervals: 10901'-11111'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10901 ft.# Of Holes:54
Interval Bottom:11111 ft.Hole Size:0.41 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/16/2020                 Interval Top: 8101 ft.    Interval Bottom: 8600 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/17/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/27/2017Treatment End Date:12/6/2017
Treatment Summary:Perforated Intervals: 8101'-8300'; 8401'-8600'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8101 ft.# Of Holes:108
Interval Bottom:8600 ft.Hole Size:0.41 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2024                  Interval Top: 6863 ft.    Interval Bottom: 11111 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/17/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/27/2017Treatment End Date:12/6/2017
Treatment Summary:42-stage plug-and-perf completion; 123775 total bbls fluid pumped: 122769 bbls fresh water (slurry) and 1006 bbls 15% HCl acid; 8479489 total lbs proppant pumped: 1010252 lbs 40/70 sand, 6717292 lbs 30/50 sand, and 751945 lbs 100 mesh.
Total fluid used in treatment (bbls):123775Max pressure during treatment (psi):7653
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):1006Min frac gradient (psi/ft):1.02
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4205
Fresh water used in treatment (bbls):122769Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8479489Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6497 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/5/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 244
BBLS_OIL 201
BTU_GAS 1364
CALC_BBLS_H2O 244
CALC_BBLS_OIL 201
CALC_GOR 920
CALC_MCF_GAS 185
CASING_PRESS 288
GRAVITY_OIL 38
MCF_GAS 185
TUBING_PRESS 1399
Perforation Data:
Interval Top:6863 ft.# Of Holes:1134
Interval Bottom:11111 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/16/2020                 Interval Top: 6863 ft.    Interval Bottom: 10900 ft.

 Completed Information for Formation CODELL
1st Production Date:1/17/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/27/2017Treatment End Date:12/6/2017
Treatment Summary:Perforated Intervals: 6863'-8100'; 8301'-8400'; 8601'-10900'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6863 ft.# Of Holes:972
Interval Bottom:10900 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2361
Total Gas Produced (MCF)45852
GOR19420
GOR DeterminationMCFE
Average BOE per Day28.205
Average MCFE per Day163.583

 Federal Financial Assurance  i 

 Tribal Well  i No