Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44421
Well Classification: OW Status: PR - 10/24/2019
Well Name/No:VT-LDS #1-16-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/24/2019
FacilityID:449627LocationID:322888
County:WELD #123Location:SWNW 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4648 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1882FNL  650 FWLLat/Long: 40.401320 / -104.656550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.401321 / -104.656550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2019
End Date: 6/16/2019
Reported: 7/15/2019
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/24/2019             Measured TD: 20445 ft.    Vertical TD: 6787 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/24/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2019
Proposed Top PZ Location:Sec:16 Twp: 5N 65W Footage: 731 FNL  2192 FWL
Bottom Hole Location:Sec:18 Twp: 5N 65W Footage: 660 FNL  460 FWL
Proposed Depth/Form:20550 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20550 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1965, Top: 1500 ft., Bottom: 20550 ft.

Wellbore Completed
Completion Date:6/21/2018
Spud Date:5/22/2018Spud Date Is:ACTUAL
Measured TD:20445 ft.Measured PB depth:20442 ft.
True Vertical TD:6787 ft.True Vertical PB depth:6787 ft.
Top PZ Location:Sec:16 Twp: 5N 65WFootage: 735 FNL  2146 FWL
Bottom Hole Location:Sec:18 Twp: 5N 65WFootage: 659 FNL  483 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-44422).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1555 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1556 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20442 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3275, Top: 118 ft., Bottom: 20445 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3955 ft.NN
SUSSEX4562 ft.NN
SHARON SPRINGS7832 ft.NN
NIOBRARA7980 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/24/2019                Interval Top: 8226 ft.    Interval Bottom: 20387 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/6/2019Treatment End Date:6/16/2019
Treatment Summary:Frac'd Niobrara with 61-stage plug-and-perf; 149468 total bbls fluid pumped: 123382 bbls gelled fluid and 26086 bbls fresh water; 12199895 total lbs proppant pumped: 7970100 lbs 40/70 mesh and 4229795 lbs 30/50 mesh.
Total fluid used in treatment (bbls):149468Max pressure during treatment (psi):8862
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):11527
Fresh water used in treatment (bbls):26086Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12199895Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8108 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 70
BBLS_OIL 648
BTU_GAS 1280
CALC_BBLS_H2O 70
CALC_BBLS_OIL 648
CALC_GOR 5307
CALC_MCF_GAS 3439
CASING_PRESS 3036
GRAVITY_OIL 51
MCF_GAS 3439
TUBING_PRESS 2812
Perforation Data:
Interval Top:8226 ft.# Of Holes:1441
Interval Bottom:20387 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)6567
Total Gas Produced (MCF)121478
GOR18498
GOR DeterminationMCFE
Average BOE per Day75.292
Average MCFE per Day436.700

 Federal Financial Assurance  i 

 Tribal Well  i No