Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44417
Well Classification: OW Status: PR - 10/24/2019
Well Name/No:VT-LDS #3-16-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/24/2019
FacilityID:449623LocationID:322888
County:WELD #123Location:SWNW 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4648 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1892FNL  578 FWLLat/Long: 40.401290 / -104.656800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.401293 / -104.656804Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2019
End Date: 6/16/2019
Reported: 7/15/2019
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/24/2019             Measured TD: 20255 ft.    Vertical TD: 6779 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/24/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2019
Proposed Top PZ Location:Sec:16 Twp: 5N 65W Footage: 1412 FNL  2143 FWL
Bottom Hole Location:Sec:18 Twp: 5N 65W Footage: 1299 FNL  511 FWL
Proposed Depth/Form:20404 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20404 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1950, Top: 1500 ft., Bottom: 20404 ft.

Wellbore Completed
Completion Date:7/8/2018
Spud Date:5/25/2018Spud Date Is:ACTUAL
Measured TD:20255 ft.Measured PB depth:20238 ft.
True Vertical TD:6779 ft.True Vertical PB depth:6779 ft.
Top PZ Location:Sec:16 Twp: 5N 65WFootage: 1412 FNL  2143 FWL
Bottom Hole Location:Sec:18 Twp: 5N 65WFootage: 1299 FNL  511 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-44422).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1601 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20244 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3250, Top: 110 ft., Bottom: 20255 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3988 ft.NN
SUSSEX4550 ft.NN
SHARON SPRINGS7698 ft.NN
NIOBRARA7831 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/24/2019                Interval Top: 8070 ft.    Interval Bottom: 20191 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/6/2019Treatment End Date:6/16/2019
Treatment Summary:Frac'd Niobrara with 61-stage plug-and-perf; 149614 total bbls fluid pumped: 123074 bbls gelled fluid and 26540 bbls fresh water; 12199993 total lbs proppant pumped: 7859998 lbs 40/70 mesh and 4339995 lbs 30/50 mesh.
Total fluid used in treatment (bbls):149614Max pressure during treatment (psi):8586
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14006
Fresh water used in treatment (bbls):26540Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12199993Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7929 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 74
BBLS_OIL 614
BTU_GAS 1280
CALC_BBLS_H2O 74
CALC_BBLS_OIL 614
CALC_GOR 5518
CALC_MCF_GAS 3388
CASING_PRESS 3012
GRAVITY_OIL 51
MCF_GAS 3388
TUBING_PRESS 2706
Perforation Data:
Interval Top:8070 ft.# Of Holes:1441
Interval Bottom:20191 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)4138
Total Gas Produced (MCF)73614
GOR17789
GOR DeterminationMCFE
Average BOE per Day46.122
Average MCFE per Day267.525

 Federal Financial Assurance  i 

 Tribal Well  i No