Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43474
Well Classification: OW Status: PR - 5/1/2022
Well Name/No:WAGNER #27C-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2022
FacilityID:447231LocationID:447233
County:WELD #123Location:SENE 22 1N67W 6
Field:WATTENBERG - #90750Elevation:4969 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1594FNL  761 FELLat/Long: 40.039455 / -104.869994Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039457 / -104.869992Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/9/2018
End Date: 4/16/2018
Reported: 5/16/2018
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2022             Measured TD: 15076 ft.    Vertical TD: 7583 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/6/2018
Proposed Top PZ Location:Sec:22 Twp: 1N 67W Footage: 1768 FNL  958 FEL
Bottom Hole Location:Sec:10 Twp: 1N 67W Footage: 800 FSL  877 FEL
Proposed Depth/Form:15904 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15894 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1877, Top: , Bottom: 15894 ft.

Wellbore Completed
Completion Date:10/30/2017
Spud Date:8/25/2017Spud Date Is:ACTUAL
Measured TD:15076 ft.Measured PB depth:15022 ft.
True Vertical TD:7583 ft.True Vertical PB depth:7583 ft.
Top PZ Location:Sec:22 Twp: 1N 67WFootage: 1507 FNL  972 FEL
Bottom Hole Location:Sec:10 Twp: 1N 67WFootage: 333 FSL  924 FEL
Log Types:MWD/GR, CL, CBL, CNL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1893 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 682, Top: 0 ft., Bottom: 1893 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 5862 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 5862 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5663 ft., Depth: 15071 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 5663 ft., Bottom: 15071 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4675 ft.
SHARON SPRINGS7270 ft.
NIOBRARA7294 ft.
FORT HAYS7840 ft.
CODELL8067 ft.
CARLILE9895 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/30/2019                 Interval Top: 9895 ft.    Interval Bottom: 10041 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2019Treatment End Date:N/A
Treatment Summary:Carlile: 9895-10041
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9895 ft.# Of Holes:384
Interval Bottom:10041 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/30/2019                 Interval Top: 8100 ft.    Interval Bottom: 14438 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2019Treatment End Date:N/A
Treatment Summary:Codell: 8100-9895, 10041-10267, 10446-14438
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8100 ft.# Of Holes:384
Interval Bottom:14438 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2022                  Interval Top: 8017 ft.    Interval Bottom: 15014 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:6/14/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/9/2018Treatment End Date:4/16/2018
Treatment Summary:PERF AND FRAC FROM 8017-15014. 148 BBL HCL-7.5, 117,280 BBL LIBERTYFR, 2,232 BBL PUMP DOWN, 119,660 TOTAL FLUID, 2,767,000# 30/50 OTTAWA/ST. PETERS, 784,410# 40/70 OTTAWA/ST. PETERS, 3,551,410# TOTAL SAND.
Total fluid used in treatment (bbls):119660Max pressure during treatment (psi):7737
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):148Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6588
Fresh water used in treatment (bbls):119512Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3551410Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7568 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 532
BBLS_OIL 153
BTU_GAS 1337
CALC_BBLS_H2O 532
CALC_BBLS_OIL 153
CALC_GOR 928
CALC_MCF_GAS 142
CASING_PRESS 2851
GRAVITY_OIL 54
MCF_GAS 142
TUBING_PRESS 2192
Perforation Data:
Interval Top:8017 ft.# Of Holes:384
Interval Bottom:15014 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/30/2019                 Interval Top: 8017 ft.    Interval Bottom: 14975 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2019Treatment End Date:N/A
Treatment Summary:Fort Hays: 8017-8100, 10267-10446, 14438-14975
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8017 ft.# Of Holes:384
Interval Bottom:14975 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4228
Total Gas Produced (MCF)113726
GOR26898
GOR DeterminationMCFE
Average BOE per Day65.258
Average MCFE per Day378.477

 Federal Financial Assurance  i 

 Tribal Well  i No