Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42587
Well Classification: OW Status: PR - 6/1/2018
Well Name/No:Marcus LD #11-379HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2018
FacilityID:444369LocationID:440806
County:WELD #123Location:SESE 34 1N67W 6
Field:WATTENBERG - #90750Elevation:5043 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1027FSL  410 FELLat/Long: 40.003192 / -104.868586Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.003192 / -104.868583Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2016
End Date: 11/27/2016
Reported: 1/13/2017
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2018             Measured TD: 18001 ft.    Vertical TD: 7796 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/17/2017
Proposed Top PZ Location:Sec:2 Twp: 1S 67W Footage: 460 FNL  476 FWL
Bottom Hole Location:Sec:11 Twp: 1S 67W Footage: 370 FSL  476 FWL
Proposed Depth/Form:17852 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17952 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2275, Top: , Bottom: 17952 ft.

Wellbore Completed
Completion Date:8/15/2016
Spud Date:8/4/2016Spud Date Is:ACTUAL
Measured TD:18001 ft.Measured PB depth:17949 ft.
True Vertical TD:7796 ft.True Vertical PB depth:7796 ft.
Top PZ Location:Sec:2 Twp: 1S 67WFootage: 530 FNL  488 FWL
Bottom Hole Location:Sec:11 Twp: 1S 67WFootage: 370 FSL  495 FWL
Log Types:CBL, Mud Log, MWD/LWD, (IND in API 123-20894)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1763 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1763 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17998 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2715, Top: 48 ft., Bottom: 17998 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4411 ft.4574 ft.NN
SUSSEX4788 ft.4971 ft.NN
SHANNON5652 ft.5842 ft.NN
SHARON SPRINGS7571 ft.7710 ft.NN
NIOBRARA7710 ft.NN
FORT HAYS8343 ft.NN
CODELL8406 ft.NN
CARLILE14611 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/6/2018                 Interval Top: 17868 ft.    Interval Bottom: 17870 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:12/13/2016Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2018Treatment End Date:N/A
Treatment Summary:Fort Hays Perforation Interval: 17868' - 17870'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:17868 ft.# Of Holes:1410
Interval Bottom:17870 ft.Hole Size:0.36 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/6/2018                 Interval Top: 14618 ft.    Interval Bottom: 15420 ft.

 Completed Information for Formation CARLILE
1st Production Date:12/13/2016Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2018Treatment End Date:N/A
Treatment Summary:Carlile Perforation Interval: 14618' - 14767', 15018' - 15420'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:14618 ft.# Of Holes:1410
Interval Bottom:15420 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 12/20/2016                Interval Top: 8608 ft.    Interval Bottom: 17870 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/13/2016Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/2/2016Treatment End Date:11/27/2016
Treatment Summary:0 bbls 15% HCl; 485,712 lbs 100 Mesh; 8,945,864 lbs 20/40; 158,332 bbls gel; Flowback determined from well test separator.
Total fluid used in treatment (bbls):158332Max pressure during treatment (psi):6811
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):15835
Fresh water used in treatment (bbls):158332Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9431576Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8194 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/20/2016Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1604
BBLS_OIL 499
BTU_GAS 1293
CALC_BBLS_H2O 1604
CALC_BBLS_OIL 499
CALC_GOR 755
CALC_MCF_GAS 377
CASING_PRESS 2400
GRAVITY_OIL 42
MCF_GAS 377
TUBING_PRESS 1565
Perforation Data:
Interval Top:8608 ft.# Of Holes:1410
Interval Bottom:17870 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/6/2018                 Interval Top: 8608 ft.    Interval Bottom: 17820 ft.

 Completed Information for Formation CODELL
1st Production Date:12/13/2016Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2018Treatment End Date:N/A
Treatment Summary:Codell Perforation Interval: 8608' - 14569', 14815' - 14969', 15468' - 17820'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8608 ft.# Of Holes:1410
Interval Bottom:17820 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1269
Total Gas Produced (MCF)45684
GOR36000
GOR DeterminationMCFE
Average BOE per Day24.940
Average MCFE per Day144.655

 Federal Financial Assurance  i 

 Tribal Well  i No