|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2018 Measured TD: 18001 ft. Vertical TD: 7796 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/17/2017 | | Proposed Top PZ Location: | Sec:2 Twp: 1S 67W | Footage: 460 FNL 476 FWL | | Bottom Hole Location: | Sec:11 Twp: 1S 67W | Footage: 370 FSL 476 FWL | | Proposed Depth/Form: | 17852 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 707, Top: 0 ft., Bottom: 1700 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17952 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2275, Top: , Bottom: 17952 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/15/2016 | | Spud Date: | 8/4/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 18001 ft. | Measured PB depth: | 17949 ft. | | True Vertical TD: | 7796 ft. | True Vertical PB depth: | 7796 ft. | | Top PZ Location: | Sec:2 Twp: 1S 67W | Footage: 530 FNL 488 FWL | | Bottom Hole Location: | Sec:11 Twp: 1S 67W | Footage: 370 FSL 495 FWL | | Log Types: | CBL, Mud Log, MWD/LWD, (IND in API 123-20894) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1763 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1763 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17998 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2715, Top: 48 ft., Bottom: 17998 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4411 ft. | 4574 ft. | N | N | | SUSSEX | 4788 ft. | 4971 ft. | N | N | | SHANNON | 5652 ft. | 5842 ft. | N | N | | SHARON SPRINGS | 7571 ft. | 7710 ft. | N | N | | NIOBRARA | 7710 ft. | | N | N | | FORT HAYS | 8343 ft. | | N | N | | CODELL | 8406 ft. | | N | N | | CARLILE | 14611 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 12/6/2018 Interval Top: 17868 ft. Interval Bottom: 17870 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 12/13/2016 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 12/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Fort Hays Perforation Interval: 17868' - 17870' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 17868 ft. | # Of Holes: | 1410 | | Interval Bottom: | 17870 ft. | Hole Size: | 0.36 in. |
|
Formation CARL Formation Classification: OW Status: CM - 12/6/2018 Interval Top: 14618 ft. Interval Bottom: 15420 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 12/13/2016 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 12/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Carlile Perforation Interval: 14618' - 14767', 15018' - 15420' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 14618 ft. | # Of Holes: | 1410 | | Interval Bottom: | 15420 ft. | Hole Size: | 0.36 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 12/20/2016 Interval Top: 8608 ft. Interval Bottom: 17870 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 12/13/2016 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/2/2016 | Treatment End Date: | 11/27/2016 | | Treatment Summary: | 0 bbls 15% HCl; 485,712 lbs 100 Mesh; 8,945,864 lbs 20/40; 158,332 bbls gel; Flowback determined from well test separator. | | Total fluid used in treatment (bbls): | 158332 | Max pressure during treatment (psi): | 6811 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 47 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 15835 | | Fresh water used in treatment (bbls): | 158332 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9431576 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8194 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/20/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1604 | | BBLS_OIL | 499 | | BTU_GAS | 1293 | | CALC_BBLS_H2O | 1604 | | CALC_BBLS_OIL | 499 | | CALC_GOR | 755 | | CALC_MCF_GAS | 377 | | CASING_PRESS | 2400 | | GRAVITY_OIL | 42 | | MCF_GAS | 377 | | TUBING_PRESS | 1565 |
| | Perforation Data: | | Interval Top: | 8608 ft. | # Of Holes: | 1410 | | Interval Bottom: | 17870 ft. | Hole Size: | 0.36 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/6/2018 Interval Top: 8608 ft. Interval Bottom: 17820 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/13/2016 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 12/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Codell Perforation Interval: 8608' - 14569', 14815' - 14969', 15468' - 17820' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8608 ft. | # Of Holes: | 1410 | | Interval Bottom: | 17820 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1647 |
| Total Gas Produced (MCF) | 60704 |
| GOR | 36857 |
| GOR Determination | MCFE |
| Average BOE per Day | 31.716 |
| Average MCFE per Day | 183.940 |
| Federal Financial Assurance | i | |
|
|