Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41634
Well Classification: OW Status: PR - 9/1/2023
Well Name/No:R&R Farms #29I-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2023
FacilityID:442050LocationID:442014
County:WELD #123Location:SWSW 29 5N63W 6
Field:WATTENBERG - #90750Elevation:4575 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:641FSL  284 FWLLat/Long: 40.365040 / -104.468600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.365038 / -104.468586Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2016
End Date: 2/10/2016
Reported: 2/17/2016
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2023             Measured TD: 11052 ft.    Vertical TD: 6563 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/12/2017
Proposed Top PZ Location:Sec:29 Twp: 5N 63W Footage: 834 FSL  48 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63W Footage: 501 FNL  57 FWL
Proposed Depth/Form:10997 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7052 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7052 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5852 ft., Depth: 10997 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/1/2015
Spud Date:8/25/2015Spud Date Is:ACTUAL
Measured TD:11052 ft.Measured PB depth:11045 ft.
True Vertical TD:6563 ft.True Vertical PB depth:6563 ft.
Top PZ Location:Sec:29 Twp: 5N 63WFootage: 834 FSL  48 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63WFootage: 501 FNL  57 FWL
Log Types:CBL, MWD (DIL in 05-123-25134)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 911 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 911 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7094 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 729, Top: 330 ft., Bottom: 7094 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6690 ft., Depth: 11048 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3362 ft.
SUSSEX3990 ft.
SHANNON4626 ft.
SHARON SPRINGS6294 ft.
NIOBRARA6447 ft.
FORT HAYS6888 ft.
CODELL6973 ft.
CARLILE7143 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/24/2020                 Interval Top: 8477 ft.    Interval Bottom: 10899 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,477'-8,639' 8,802'-9,287' 10,215'-10,372' 10,632'-10,899'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8477 ft.# Of Holes:
Interval Bottom:10899 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/24/2020                 Interval Top: 7388 ft.    Interval Bottom: 11052 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,388'-8,477' 8,639'-8,802' 9,287'-10,215' 10,372'-10,632' 10,899'-11,052
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7388 ft.# Of Holes:
Interval Bottom:11052 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/24/2020                 Interval Top: 7143 ft.    Interval Bottom: 7388 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,143'-7,388'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7143 ft.# Of Holes:
Interval Bottom:7388 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/1/2023                  Interval Top: 7143 ft.    Interval Bottom: 11052 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/5/2016Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2016Treatment End Date:2/10/2016
Treatment Summary:20 Stage Sliding Sleeve, Swell Packer set at 7,143' Total Fluid: 77,488 bbls Gel Fluid: 42,567 bbls Slickwater Fluid: 34,921 bbls Total Proppant: 4,292,940 lbs Silica Proppant: 4,292,940 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):77488Max pressure during treatment (psi):4947
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6092
Fresh water used in treatment (bbls):77488Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4292940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6669 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2016Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 240
BBLS_OIL 306
BTU_GAS 1481
CALC_BBLS_H2O 240
CALC_BBLS_OIL 306
CALC_GOR 2170
CALC_MCF_GAS 664
CASING_PRESS 2254
GRAVITY_OIL 49
MCF_GAS 664
TUBING_PRESS 1278
Perforation Data:
Interval Top:7143 ft.# Of Holes:
Interval Bottom:11052 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)2918
Total Gas Produced (MCF)28128
GOR9639
GOR DeterminationBOE
Average BOE per Day21.209
Average MCFE per Day123.003

 Federal Financial Assurance  i 

 Tribal Well  i No