|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2023 Measured TD: 11052 ft. Vertical TD: 6563 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/12/2017 | | Proposed Top PZ Location: | Sec:29 Twp: 5N 63W | Footage: 834 FSL 48 FWL | | Bottom Hole Location: | Sec:29 Twp: 5N 63W | Footage: 501 FNL 57 FWL | | Proposed Depth/Form: | 10997 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7052 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7052 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5852 ft., Depth: 10997 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/1/2015 | | Spud Date: | 8/25/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 11052 ft. | Measured PB depth: | 11045 ft. | | True Vertical TD: | 6563 ft. | True Vertical PB depth: | 6563 ft. | | Top PZ Location: | Sec:29 Twp: 5N 63W | Footage: 834 FSL 48 FWL | | Bottom Hole Location: | Sec:29 Twp: 5N 63W | Footage: 501 FNL 57 FWL | | Log Types: | CBL, MWD (DIL in 05-123-25134) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 911 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 0 ft., Bottom: 911 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7094 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 729, Top: 330 ft., Bottom: 7094 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6690 ft., Depth: 11048 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3362 ft. | | | | | SUSSEX | 3990 ft. | | | | | SHANNON | 4626 ft. | | | | | SHARON SPRINGS | 6294 ft. | | | | | NIOBRARA | 6447 ft. | | | | | FORT HAYS | 6888 ft. | | | | | CODELL | 6973 ft. | | | | | CARLILE | 7143 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 3/24/2020 Interval Top: 8477 ft. Interval Bottom: 10899 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/24/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,477'-8,639' 8,802'-9,287' 10,215'-10,372' 10,632'-10,899' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8477 ft. | # Of Holes: | | | Interval Bottom: | 10899 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 3/24/2020 Interval Top: 7388 ft. Interval Bottom: 11052 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/24/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7,388'-8,477' 8,639'-8,802' 9,287'-10,215' 10,372'-10,632' 10,899'-11,052 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7388 ft. | # Of Holes: | | | Interval Bottom: | 11052 ft. | Hole Size: | |
|
Formation CARL Formation Classification: OW Status: CM - 3/24/2020 Interval Top: 7143 ft. Interval Bottom: 7388 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/24/2020 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7,143'-7,388' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 7143 ft. | # Of Holes: | | | Interval Bottom: | 7388 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/1/2023 Interval Top: 7143 ft. Interval Bottom: 11052 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 3/5/2016 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/8/2016 | Treatment End Date: | 2/10/2016 | | Treatment Summary: | 20 Stage Sliding Sleeve, Swell Packer set at 7,143'
Total Fluid: 77,488 bbls
Gel Fluid: 42,567 bbls
Slickwater Fluid: 34,921 bbls
Total Proppant: 4,292,940 lbs
Silica Proppant: 4,292,940 lbs
Method for determining flowback: measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 77488 | Max pressure during treatment (psi): | 4947 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 6092 | | Fresh water used in treatment (bbls): | 77488 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4292940 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6669 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 240 | | BBLS_OIL | 306 | | BTU_GAS | 1481 | | CALC_BBLS_H2O | 240 | | CALC_BBLS_OIL | 306 | | CALC_GOR | 2170 | | CALC_MCF_GAS | 664 | | CASING_PRESS | 2254 | | GRAVITY_OIL | 49 | | MCF_GAS | 664 | | TUBING_PRESS | 1278 |
| | Perforation Data: | | Interval Top: | 7143 ft. | # Of Holes: | | | Interval Bottom: | 11052 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2918 |
| Total Gas Produced (MCF) | 28128 |
| GOR | 9639 |
| GOR Determination | BOE |
| Average BOE per Day | 21.209 |
| Average MCFE per Day | 123.003 |
| Federal Financial Assurance | i | |
|
|