Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41634
Well Classification: OW Status: SI - 1/1/2026
Well Name/No:R&R Farms #29I-401
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:442050LocationID:442014
County:WELD #123Location:SWSW 29 5N63W 6
Field:WATTENBERG - #90750Elevation:4575 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:641FSL  284 FWLLat/Long: 40.365040 / -104.468600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.365038 / -104.468586Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2016
End Date: 2/10/2016
Reported: 2/17/2016
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2026             Measured TD: 11052 ft.    Vertical TD: 6563 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/12/2017
Proposed Top PZ Location:Sec:29 Twp: 5N 63W Footage: 834 FSL  48 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63W Footage: 501 FNL  57 FWL
Proposed Depth/Form:10997 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7052 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7052 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5852 ft., Depth: 10997 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/1/2015
Spud Date:8/25/2015Spud Date Is:ACTUAL
Measured TD:11052 ft.Measured PB depth:11045 ft.
True Vertical TD:6563 ft.True Vertical PB depth:6563 ft.
Top PZ Location:Sec:29 Twp: 5N 63WFootage: 834 FSL  48 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63WFootage: 501 FNL  57 FWL
Log Types:CBL, MWD (DIL in 05-123-25134)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 911 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 911 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7094 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 729, Top: 330 ft., Bottom: 7094 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6690 ft., Depth: 11048 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3362 ft.
SUSSEX3990 ft.
SHANNON4626 ft.
SHARON SPRINGS6294 ft.
NIOBRARA6447 ft.
FORT HAYS6888 ft.
CODELL6973 ft.
CARLILE7143 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/24/2020                 Interval Top: 8477 ft.    Interval Bottom: 10899 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,477'-8,639' 8,802'-9,287' 10,215'-10,372' 10,632'-10,899'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8477 ft.# Of Holes:
Interval Bottom:10899 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/24/2020                 Interval Top: 7388 ft.    Interval Bottom: 11052 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,388'-8,477' 8,639'-8,802' 9,287'-10,215' 10,372'-10,632' 10,899'-11,052
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7388 ft.# Of Holes:
Interval Bottom:11052 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/24/2020                 Interval Top: 7143 ft.    Interval Bottom: 7388 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/24/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,143'-7,388'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7143 ft.# Of Holes:
Interval Bottom:7388 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 1/1/2026                  Interval Top: 7143 ft.    Interval Bottom: 11052 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/5/2016Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/8/2016Treatment End Date:2/10/2016
Treatment Summary:20 Stage Sliding Sleeve, Swell Packer set at 7,143' Total Fluid: 77,488 bbls Gel Fluid: 42,567 bbls Slickwater Fluid: 34,921 bbls Total Proppant: 4,292,940 lbs Silica Proppant: 4,292,940 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):77488Max pressure during treatment (psi):4947
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6092
Fresh water used in treatment (bbls):77488Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4292940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6669 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2016Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 240
BBLS_OIL 306
BTU_GAS 1481
CALC_BBLS_H2O 240
CALC_BBLS_OIL 306
CALC_GOR 2170
CALC_MCF_GAS 664
CASING_PRESS 2254
GRAVITY_OIL 49
MCF_GAS 664
TUBING_PRESS 1278
Perforation Data:
Interval Top:7143 ft.# Of Holes:
Interval Bottom:11052 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2316
Total Gas Produced (MCF)14135
GOR6103
GOR DeterminationBOE
Average BOE per Day13.033
Average MCFE per Day75.588

 Federal Financial Assurance  i 

 Tribal Well  i No