Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40173
Well Classification: OW Status: PR - 6/1/2023
Well Name/No:SUMMIT #4C-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2023
FacilityID:438868LocationID:438862
County:WELD #123Location:SWSW 29 2N65W 6
Field:WATTENBERG - #90750Elevation:4943 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:395FSL  941 FWLLat/Long: 40.103320 / -104.693786Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103322 / -104.693786Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2015
End Date: 3/12/2015
Reported: 4/30/2015
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2023             Measured TD: 12392 ft.    Vertical TD: 7317 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:9/12/2016
Proposed Top PZ Location:Sec:29 Twp: 2N 65W Footage: 578 FSL  281 FWL
Bottom Hole Location:Sec:29 Twp: 2N 65W Footage: 26 FNL  226 FWL
Proposed Depth/Form:12408 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 1118 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7725 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 820, Top: 0 ft., Bottom: 7725 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6725 ft., Depth: 12408 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/26/2014
Spud Date:9/23/2014Spud Date Is:ACTUAL
Measured TD:12392 ft.Measured PB depth:12367 ft.
True Vertical TD:7317 ft.True Vertical PB depth:7316 ft.
Top PZ Location:Sec:29 Twp: 2N 65WFootage: 578 FSL  281 FWL
Bottom Hole Location:Sec:29 Twp: 2N 65WFootage: 26 FNL  226 FWL
Log Types:CBL, GR, MUD, (RES in API# 05-123-40175)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 429, Top: 0 ft., Bottom: 1100 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7707 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 40 ft., Bottom: 7707 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6766 ft., Depth: 12377 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4564 ft.
SHARON SPRINGS7129 ft.
NIOBRARA7186 ft.
FORT HAYS7512 ft.
CODELL7656 ft.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 6/1/2023                  Interval Top: 7760 ft.    Interval Bottom: 12392 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/16/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2015Treatment End Date:3/12/2015
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7760-12,392. 127,421 BBL SLICKWATER, - 127,421 BBL TOTAL FLUID 2,174,860# 30/50 OTTAWA/ST. PETERS, 1,868,320# 40/70 GENOA/SAND HILLS, - 4,043,180# TOTAL SAND." ENTERED FT HAYS 7515-7633; 7701-8301 CODELL 7634-7700; 8302-12,392 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):127421Max pressure during treatment (psi):7343
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1404
Fresh water used in treatment (bbls):127421Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4043180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 65
BTU_GAS 1405
CALC_BBLS_OIL 65
CALC_GOR 1892
CALC_MCF_GAS 123
CASING_PRESS 800
GRAVITY_OIL 50
MCF_GAS 123
Perforation Data:
Interval Top:7760 ft.# Of Holes:0
Interval Bottom:12392 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/13/2017                 Interval Top: 7634 ft.    Interval Bottom: 12392 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:CODELL 7634-7700; 8302-12,392
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7634 ft.# Of Holes:
Interval Bottom:12392 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/13/2017                 Interval Top: 7515 ft.    Interval Bottom: 8301 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:FT HAYS 7515-7633; 7701-8301
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7515 ft.# Of Holes:
Interval Bottom:8301 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2208
Total Gas Produced (MCF)10443
GOR4729
GOR DeterminationBOE
Average BOE per Day10.942
Average MCFE per Day63.473

 Federal Financial Assurance  i 

 Tribal Well  i No