Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39386
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:KODAK NORTH FD #25-040HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:437033LocationID:333035
County:WELD #123Location:SENW 26 6N67W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2253FNL  1850 FWLLat/Long: 40.459011 / -104.863714Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.459011 / -104.863714Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2020
End Date: 1/28/2020
Reported: 2/6/2020
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 16378 ft.    Vertical TD: 7112 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/17/2018
Proposed Top PZ Location:Sec:26 Twp: 6N 67W Footage: 596 FNL  2166 FWL
Bottom Hole Location:Sec:25 Twp: 6N 67W Footage: 466 FNL  1 FEL
Proposed Depth/Form:15774 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2301 , Unit Acreage: 1120, Drill Unit: S25:All,S26:E2,E2W2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1517 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 680, Top: 0 ft., Bottom: 1517 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16441 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2135, Top: 3571 ft., Bottom: 16441 ft.

Wellbore Completed
Completion Date:12/15/2019
Spud Date:1/23/2017Spud Date Is:ACTUAL
Measured TD:16378 ft.Measured PB depth:16367 ft.
True Vertical TD:7112 ft.True Vertical PB depth:7112 ft.
Top PZ Location:Sec:26 Twp: 6N 67WFootage: 596 FNL  2166 FWL
Bottom Hole Location:Sec:25 Twp: 6N 67WFootage: 466 FNL  1 FEL
Log Types:
Log Types:Mud Log, MWD/LWD, CBL, (Composite in 123-39387)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1524 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 1524 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16378 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2055, Top: 2481 ft., Bottom: 16378 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3512 ft.3591 ft.NN
SUSSEX4085 ft.4285 ft.NN
SHANNON4676 ft.4747 ft.NN
SHARON SPRINGS7005 ft.NN
NIOBRARA7141 ft.NN
FORT HAYS7592 ft.NN
CODELL7663 ft.NN
CARLILE7863 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 13510 ft.    Interval Bottom: 13731 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/28/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 13510' - 13731'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13510 ft.# Of Holes:1378
Interval Bottom:13731 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 9633 ft.    Interval Bottom: 15786 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/28/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 9633' - 9848', 10717' - 11237', 11566' - 12453', 13732' - 14574', 14877' - 15786'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9633 ft.# Of Holes:1378
Interval Bottom:15786 ft.Hole Size:0.6031746 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8930 ft.    Interval Bottom: 16159 ft.

 Completed Information for Formation CODELL
1st Production Date:2/28/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8930' - 9632', 9849' - 10716', 11238' - 11565', 12454' - 13509', 14575' - 14876', 15787' - 16159'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8930 ft.# Of Holes:1378
Interval Bottom:16159 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 2/1/2025                  Interval Top: 8007 ft.    Interval Bottom: 16159 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/28/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2020Treatment End Date:1/28/2020
Treatment Summary:36 bbls 15% HCL Acid; 435,895# 100 Mesh Sand; 7,778,486# 20/40 Sand; 137,097 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):137133Max pressure during treatment (psi):4378
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:53
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20090
Fresh water used in treatment (bbls):137097Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8214381Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7110 ft.
Tubing Packer Depth:7098 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/29/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 193
BTU_GAS 1306
CALC_BBLS_H2O 194
CALC_BBLS_OIL 193
CALC_GOR 1456
CALC_MCF_GAS 281
CASING_PRESS 950
GRAVITY_OIL 45
MCF_GAS 281
TUBING_PRESS 486
Perforation Data:
Interval Top:8007 ft.# Of Holes:1378
Interval Bottom:16159 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3501
Total Gas Produced (MCF)29128
GOR8319
GOR DeterminationBOE
Average BOE per Day23.191
Average MCFE per Day134.532

 Federal Financial Assurance  i 

 Tribal Well  i No