Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38626
Well Classification: OW Status: PR - 10/1/2025
Well Name/No:ELLIOTT #30N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:435506LocationID:330311
County:WELD #123Location:NENE 18 3N67W 6
Field:WATTENBERG - #90750Elevation:4836 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:666FNL  597 FELLat/Long: 40.231376 / -104.925388Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.231378 / -104.925392Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2014
End Date: 8/7/2014
Reported: 9/29/2014
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2025             Measured TD: 11864 ft.    Vertical TD: 6981 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/19/2015
Proposed Top PZ Location:Sec:18 Twp: 3N 67W Footage: 82 FNL  568 FEL
Bottom Hole Location:Sec:18 Twp: 3N 67W Footage: 43 FNL  74 FWL
Proposed Depth/Form:12016 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7361 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 780, Top: 0 ft., Bottom: 7361 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6288 ft., Depth: 12016 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/2/2014
Spud Date:2/22/2014Spud Date Is:ACTUAL
Measured TD:11864 ft.Measured PB depth:11840 ft.
True Vertical TD:6981 ft.True Vertical PB depth:6981 ft.
Top PZ Location:Sec:18 Twp: 3N 67WFootage: 82 FNL  568 FEL
Bottom Hole Location:Sec:18 Twp: 3N 67WFootage: 43 FNL  74 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 402, Top: 0 ft., Bottom: 1077 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7336 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 46 ft., Bottom: 7336 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6429 ft., Depth: 11849 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4037 ft.
SHARON SPRINGS6975 ft.
NIOBRARA7243 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2025                 Interval Top: 7364 ft.    Interval Bottom: 11864 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/5/2014Treatment End Date:8/7/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7364-11864. 15293 BBL CROSSLINK GEL,2241 BBL LINEAR GEL,74751 BBL SLICKWATER,92284 BBL TOTAL FLUID. 436451# 30/50 GENOA/SAND HILLS,2252701# 40/70 GENOA/SAND HILLS,2689152# TOTAL SAND.
Total fluid used in treatment (bbls):92284Max pressure during treatment (psi):7351
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):4200Total flowback volume recovered (bbls):1080
Fresh water used in treatment (bbls):88084Disposition method For flowback:RECYCLE
Total proppant used (lbs):2689152Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 165
BTU_GAS 1374
CALC_BBLS_OIL 165
CALC_GOR 1679
CALC_MCF_GAS 277
CASING_PRESS 500
GRAVITY_OIL 50
MCF_GAS 277
Perforation Data:
Interval Top:7364 ft.# Of Holes:0
Interval Bottom:11864 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2694
Total Gas Produced (MCF)25058
GOR9301
GOR DeterminationBOE
Average BOE per Day20.260
Average MCFE per Day117.510

 Federal Financial Assurance  i 

 Tribal Well  i No