|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: Status: SI - 2/1/2025 Measured TD: 12195 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: SI - 2/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2015 | | Proposed Top PZ Location: | Sec:21 Twp: 1N 67W | Footage: 671 FSL 1434 FWL | | Bottom Hole Location: | Sec:21 Twp: 1N 67W | Footage: 486 FNL 1413 FWL | | Proposed Depth/Form: | 12029 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8073 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 0 ft., Bottom: 8073 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7043 ft., Depth: 12230 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/17/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 12195 ft. | Measured PB depth: | 12176 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:21 Twp: 1N 67W | Footage: 671 FSL 1434 FWL | | Bottom Hole Location: | Sec:21 Twp: 1N 67W | Footage: 486 FNL 1413 FWL | | Log Types: | CBL, GR, MUD | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 945 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 353, Top: 0 ft., Bottom: 942 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8076 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 780, Top: 1631 ft., Bottom: 8076 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7097 ft., Depth: 12186 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 1270 ft., Depth: 1950 ft., Bottom: 1290 ft., Sacks: 160, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 1.1 , Top: 1454 ft., Depth: 1440 ft., Bottom: 1510 ft., Sacks: 120, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 1.2 , Top: 1880 ft., Depth: 1240 ft., Bottom: 2014 ft., Sacks: 120, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7338 ft. | | | | | NIOBRARA | 7382 ft. | | | | | FORT HAYS | 7922 ft. | | | | | CODELL | 8900 ft. | | | |
Formation NBFHC Formation Classification: OW Status: SI - 2/1/2025 Interval Top: 8101 ft. Interval Bottom: 12195 ft.| Completed Information for Formation NIOBRARA-FT HAYS-CODELL | | 1st Production Date: | 2/24/2014 | Choke Size: | 14.000 in. | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/26/2014 | Treatment End Date: | 1/27/2014 | | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 8101-12195.
10832 BBL CROSSLINK GEL, 2372 BBL LINEAR GEL, 67866 BBL SLICKWATER, 81071 BBL TOTAL FLUID.
400100# 30/50 OTTAWA/ST. PETERS, 1909860# 40/70 OTTAWA/ST. PETERS, 2309960# TOTAL SAND.
We entered the Ft Hays 7926-8103, 8386-8906, 10405-10546
Nio 8103-8386
Codell 8906-10405, 10546-12194
| | Total fluid used in treatment (bbls): | 81071 | Max pressure during treatment (psi): | 6303 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 32 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | 81071 | Total flowback volume recovered (bbls): | 6597 | | Fresh water used in treatment (bbls): | 81071 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2309960 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/5/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 41 | | BTU_GAS | 1118 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 41 | | CALC_GOR | 3951 | | CALC_MCF_GAS | 162 | | CASING_PRESS | 1250 | | GRAVITY_OIL | 48 | | MCF_GAS | 162 |
| | Perforation Data: | | Interval Top: | 8101 ft. | # Of Holes: | 0 | | Interval Bottom: | 12195 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 451 |
| Total Gas Produced (MCF) | 7862 |
| GOR | 17432 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.855 |
| Average MCFE per Day | 28.167 |
| Federal Financial Assurance | i | |
|
|