|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/15/2024 Measured TD: 15019 ft. Vertical TD: 7266 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/15/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/27/2014 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 1877 FNL 166 FEL | | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 1816 FNL 2178 FEL | | Proposed Depth/Form: | 14484 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 280, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1007 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 381, Top: 0 ft., Bottom: 1007 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7794 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 0 ft., Bottom: 7794 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6787 ft., Depth: 15061 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 540, Top: 6887 ft., Bottom: 15061 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/12/2015 | | Spud Date: | 1/11/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15019 ft. | Measured PB depth: | 14969 ft. | | True Vertical TD: | 7266 ft. | True Vertical PB depth: | 7266 ft. | | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 1865 FNL 179 FEL | | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 1825 FNL 2123 FEL | | Log Types: | | | Log Types: | MWD with GR, CBL, CCL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1020 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 381, Top: 0 ft., Bottom: 1020 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7815 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 44 ft., Bottom: 7815 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15015 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 931, Top: 0 ft., Bottom: 15019 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4155 ft. | | | | | SHARON SPRINGS | 7138 ft. | | | | | NIOBRARA | 7217 ft. | | | | | FORT HAYS | 7628 ft. | | | | | CODELL | 7730 ft. | | | | | CARLILE | 14876 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 1/23/2017 Interval Top: 14878 ft. Interval Bottom: 14957 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 14878 ft. | # Of Holes: | 432 | | Interval Bottom: | 14957 ft. | Hole Size: | 0.46 in. |
|
Formation CD-CRL Formation Classification: OW Status: AB - 10/15/2024 Interval Top: 7827 ft. Interval Bottom: 14957 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 8/15/2016 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/21/2016 | Treatment End Date: | 7/26/2016 | | Treatment Summary: | PERF AND FRAC FROM 7827-14,957.
14 BBL 7.5% HCL ACID, 4,333 BBL PUMP DOWN, 129,234 BBL SLICKWATER, - 133,581 BBL TOTAL FLUID
611,518# 100 MESH, 3,310,466# 40/70 PREMIUM, - 3,921,984# TOTAL SAND.
ENTERED CODELL 7827-14,878;
CARLILE 14,878-14,957;
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
(SEE ATTACHMENT)
| | Total fluid used in treatment (bbls): | 133581 | Max pressure during treatment (psi): | 7483 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | 14 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 4216 | | Fresh water used in treatment (bbls): | 133567 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3921984 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/19/2016 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 275 | | BBLS_OIL | 149 | | BTU_GAS | 1367 | | CALC_BBLS_H2O | 275 | | CALC_BBLS_OIL | 149 | | CALC_GOR | 1664 | | CALC_MCF_GAS | 248 | | CASING_PRESS | 1450 | | GRAVITY_OIL | 48 | | MCF_GAS | 248 |
| | Perforation Data: | | Interval Top: | 7827 ft. | # Of Holes: | 432 | | Interval Bottom: | 14957 ft. | Hole Size: | 0.46 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/23/2017 Interval Top: 7827 ft. Interval Bottom: 14878 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7827 ft. | # Of Holes: | 432 | | Interval Bottom: | 14878 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/15/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|