Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36316
Well Classification: OW Status: PR - 4/1/2018
Well Name/No:LOGAN #2H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:STRACHAN EXPLORATION INC - 83130
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2018
FacilityID:430812LocationID:430811
County:WELD #123Location:SWSE 19 7N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4939 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:330FSL  1745 FELLat/Long: 40.554300 / -104.018800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.554310 / -104.018790Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/18/2013
End Date: 1/18/2013
Reported: 3/5/2013
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2018             Measured TD: 12911 ft.    Vertical TD: 6111 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/19/2014
Proposed Top PZ Location:Sec:19 Twp: 7N 59W Footage: 675 FSL  1285 FEL
Bottom Hole Location:Sec:20 Twp: 7N 59W Footage: 643 FNL  1657 FEL
Proposed Depth/Form:12894 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-206 , Unit Acreage: 1280, Drill Unit: SEC. 19 & 20
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 75 , Citings Type: PLANNED
Cement:Sacks: 20, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6560 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 650, Top: , Bottom: 6560 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5600 ft., Depth: 12894 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/2/2012
Spud Date:11/30/2012Spud Date Is:Actual
Measured TD:12911 ft.Measured PB depth:12911 ft.
True Vertical TD:6111 ft.True Vertical PB depth:6111 ft.
Top PZ Location:Sec:19 Twp: 7N 59WFootage: 675 FSL  1285 FEL
Bottom Hole Location:Sec:20 Twp: 7N 59WFootage: 643 FNL  1657 FEL
Log Types:LWD and CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 0 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 997 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6560 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 1050 ft., Bottom: 6560 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6393 ft., Depth: 12911 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5988 ft.6144 ft.NN
NIOBRARA6144 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2018                  Interval Top: 6701 ft.    Interval Bottom: 12808 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/25/2013Choke Size:64.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2013Treatment End Date:1/21/2013
Treatment Summary:Fracture stimulation through a port and packer system with 4,127,107 lbs. of 20/40 sand. 369,045 lbs. of 40/70 sand, and 469,627 lbs. of 20/40 RC; the total amount of fluids used was 79,606 bbls. of fresh water.
Total fluid used in treatment (bbls):79606Max pressure during treatment (psi):7233
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):79606Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4968078Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5822 ft.
Tubing Packer Depth:5822 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2013Test Method:
Hours Tested:6Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 304
BBLS_OIL 122
BTU_GAS 1350
CALC_BBLS_H2O 1216
CALC_BBLS_OIL 488
CALC_GOR 672
CALC_MCF_GAS 328
CASING_PRESS 207
GRAVITY_OIL 36
MCF_GAS 82
TUBING_PRESS 3300
Perforation Data:
Interval Top:6701 ft.# Of Holes:
Interval Bottom:12808 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)2909
Total Gas Produced (MCF)8417
GOR2893
GOR DeterminationBOE
Average BOE per Day11.928
Average MCFE per Day69.171

 Federal Financial Assurance  i 

 Tribal Well  i No