| Construction | Form: (02 ) 400250933 11/20/2012 | Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/run-off and the release of fluids for the location. See atttached Construction Layout Drawing.
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Fresh Water Storage Pit has already been constructed on Section 31 Township 7N Range 59W and will be used for the storage of fresh water for the Logan 2H well to minimize surface disturbance. |
| Drilling/Completion Operations | Form: (02 ) 400250933 11/20/2012 | Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
|