|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/7/2023 Measured TD: 7507 ft. Vertical TD: 7395 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/7/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/13/2013 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 65W | Footage: 2542 FNL 1322 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 65W | Footage: 2540 FNL 1323 FEL | | Proposed Depth/Form: | 7539 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 219, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7539 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 127, Top: 6752 ft., Bottom: 7539 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/20/2012 | | Spud Date: | 11/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7507 ft. | Measured PB depth: | 7460 ft. | | True Vertical TD: | 7395 ft. | True Vertical PB depth: | 7348 ft. | | Top PZ Location: | Sec:4 Twp: 3N 65W | Footage: 2542 FNL 1322 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 65W | Footage: 2540 FNL 1323 FEL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 621 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 645 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7479 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 3208 ft., Bottom: 7492 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4496 ft. | | | | | NIOBRARA | 6981 ft. | | | | | CODELL | 7252 ft. | | | | | GREENHORN | 7315 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/27/2013 Interval Top: 7253 ft. Interval Bottom: 7267 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/14/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/8/2012 | Treatment End Date: | 12/8/2012 | | Treatment Summary: | Frac'd the Codell with 250,120# 30/50 sand, with 76,780 gals. SLF 12-08-12 | | Total fluid used in treatment (bbls): | 1828 | Max pressure during treatment (psi): | 5067 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | 1828 | Total flowback volume recovered (bbls): | 438 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250120 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7253 ft. | # Of Holes: | 42 | | Interval Bottom: | 7267 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/7/2023 Interval Top: 6987 ft. Interval Bottom: 7267 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/14/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/18/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6950. 12-16-12
Drilled out CBP, CFP to commingle the CDL-NBRR. 12-18-12 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7225 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 47 | | BTU_GAS | 1285 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 22979 | | CALC_MCF_GAS | 1080 | | CASING_PRESS | 1074 | | GRAVITY_OIL | 60 | | MCF_GAS | 1080 | | TUBING_PRESS | 862 |
| | Perforation Data: | | Interval Top: | 6987 ft. | # Of Holes: | 98 | | Interval Bottom: | 7267 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/27/2013 Interval Top: 6987 ft. Interval Bottom: 7055 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/14/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/8/2012 | Treatment End Date: | 12/8/2012 | | Treatment Summary: | Set CFP @ 7110'. 12-08-12
Frac'd the Niobrara with 250,280# 30/50 sand with 88,914 gals SLF. 12-08-12 | | Total fluid used in treatment (bbls): | 2117 | Max pressure during treatment (psi): | 5979 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 2117 | Total flowback volume recovered (bbls): | 438 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250280 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6987 ft. | # Of Holes: | 56 | | Interval Bottom: | 7055 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/07/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|