|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2024 Measured TD: 7435 ft. Vertical TD: 7323 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/19/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 1980 FSL 660 FWL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 1980 FSL 660 FWL | | Proposed Depth/Form: | 7295 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 403-1 , Unit Acreage: 40, Drill Unit: NW/4SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7295 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7295 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/22/2011 | | Spud Date: | 10/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7435 ft. | Measured PB depth: | 7397 ft. | | True Vertical TD: | 7323 ft. | True Vertical PB depth: | 7286 ft. | | Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 2031 FSL 633 FWL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 2034 FSL 629 FWL | | Log Types: | SD-DSN-AC-TR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 638 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 15 ft., Bottom: 638 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7414 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 975, Top: 350 ft., Bottom: 7414 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3554 ft. | | | | | SUSSEX | 4101 ft. | | | | | SHANNON | 4625 ft. | 4700 ft. | | | | NIOBRARA | 6925 ft. | | | | | FORT HAYS | 7231 ft. | | | | | CODELL | 7252 ft. | | | |
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2024 Interval Top: 6934 ft. Interval Bottom: 7276 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/25/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/21/2011 | | Treatment Summary: | NB PERF 6934-7140 HOLES 66 SIZE 0.42 CD PERF 7254-7276 HOLES 66 SIZE 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 248,581 gal Slickwater w/ 100,900# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 208,885 gal Slickwater w/ 75,440# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 100 | | BTU_GAS | 1228 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 500 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 47 | | MCF_GAS | 500 |
| | Perforation Data: | | Interval Top: | 6934 ft. | # Of Holes: | 132 | | Interval Bottom: | 7276 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 05/22/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 06/30/2024 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|