|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/16/2018 Measured TD: 6910 ft. Vertical TD: 6636 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/16/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 4/19/2013 | Proposed Top PZ Location: | Sec:33 Twp: 5N 63W | Footage: 674 FSL 1994 FEL | Bottom Hole Location: | Sec:33 Twp: 5N 63W | Footage: 674 FSL 1994 FEL | Proposed Depth/Form: | 6925 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SW/4 SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 490, Top: 0 ft., Bottom: 697 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6925 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 6075 ft., Bottom: 6925 ft. |
| | |
Wellbore Completed | Completion Date: | 6/27/2011 | Spud Date: | 6/23/2011 | Spud Date Is: | ACTUAL | Measured TD: | 6910 ft. | Measured PB depth: | 6857 ft. | True Vertical TD: | 6636 ft. | True Vertical PB depth: | 6583 ft. | Top PZ Location: | Sec:33 Twp: 5N 63W | Footage: 674 FSL 1994 FEL | Bottom Hole Location: | Sec:33 Twp: 5N 63W | Footage: 674 FSL 1994 FEL | Log Types: | CBL, GR, CD, CN, Dl | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 754 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 610, Top: 0 ft., Bottom: 754 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6885 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 2400 ft., Bottom: 6885 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3287 ft. | | | | SUSSEX | 3924 ft. | | | | NIOBRARA | 6223 ft. | | | | CODELL | 6474 ft. | | | | FORT HAYS | 6725 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/16/2018 Interval Top: 6500 ft. Interval Bottom: 6761 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/30/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/22/2011 | Treatment Summary: | CODELL PUMPED 33,222 GAL PAD FLUID AND 101,556 GAL PHASERFRAC W/231,820 LBS 20/40 SAND AND 16,000 LBS 20/40 SB EXCEL. ISDP 3546 PSI; ATP 4038 PSI, ATR 23.3 BPM. NIOBRARA PUMPED 19,488 PAD FLUID AND 118,020 GAL PHASER FRAC W/260,200 LBS. 30/50 SAND. ISDP 3336 PSI; ATP 4119 PSI, ATR 46.6 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/31/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 57 | CALC_BBLS_OIL | 57 | CASING_PRESS | 1900 | GRAVITY_OIL | 40 |
| Perforation Data: | Interval Top: | 6500 ft. | # Of Holes: | 96 | Interval Bottom: | 6761 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | Y | 07/16/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|