|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/24/2020 Measured TD: 8701 ft. Vertical TD: 8521 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/24/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/15/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 2500 FSL 1200 FEL | | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 2500 FSL 1200 FEL | | Proposed Depth/Form: | 8662 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 980 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8662 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7507 ft., Bottom: 8662 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/9/2011 | | Spud Date: | 11/3/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8701 ft. | Measured PB depth: | 8602 ft. | | True Vertical TD: | 8521 ft. | True Vertical PB depth: | 8422 ft. | | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 2452 FSL 1191 FEL | | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 2452 FSL 1191 FEL | | Log Types: | CBL/DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 1002 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 839, Top: 0 ft., Bottom: 1002 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8667 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 748, Top: 4080 ft., Bottom: 8667 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4914 ft. | | | | | NIOBRARA | 7735 ft. | | | | | CODELL | 8136 ft. | | | | | J SAND | 8533 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/1/2020 Interval Top: 8546 ft. Interval Bottom: 8568 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/19/2011 | | Treatment Summary: | Frac'd the J-Sand 8546’– 8568’, (44 holes) w/ 62,748 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,300# 20/40 Sand. 12-20-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8546 ft. | # Of Holes: | 44 | | Interval Bottom: | 8568 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 8136 ft. Interval Bottom: 8156 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/20/2011 | | Treatment Summary: | Set CFP @ 8190'. 12-20-11
Frac'd the Codell 8136’ – 8156’, (40 holes) w/ 88,368 gal 22 # pHaserFrac Hybrid cross
linked gel containing 251,640 # 30/50 sand. 12-20-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8136 ft. | # Of Holes: | 40 | | Interval Bottom: | 8156 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/1/2012 Interval Top: 7737 ft. Interval Bottom: 8568 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/1/2012 | | Treatment Summary: | Set CBP @ 7650'. 03-28-12
Drilled out CBP @ 7650', CFP's @ 7970', 8190' to commingle the JSND-NBRR-CDL. 03-28-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8530 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 105 | | BBLS_OIL | 38 | | BTU_GAS | 1230 | | CALC_BBLS_H2O | 105 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 21921 | | CALC_MCF_GAS | 833 | | CASING_PRESS | 1546 | | GRAVITY_OIL | 51 | | MCF_GAS | 833 | | TUBING_PRESS | 878 |
| | Perforation Data: | | Interval Top: | 7737 ft. | # Of Holes: | 220 | | Interval Bottom: | 8568 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/1/2020 Interval Top: 7737 ft. Interval Bottom: 8156 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7737 ft. | # Of Holes: | 176 | | Interval Bottom: | 8156 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 7737 ft. Interval Bottom: 7934 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/20/2011 | | Treatment Summary: | Set CFP @ 7970'. 12-20-11
Frac'd the Niobrara 7737’ – 7934’ (136 holes), w/ 99,708 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 30/50 sand. 12-20-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7737 ft. | # Of Holes: | 136 | | Interval Bottom: | 7934 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/01/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|