|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 7915 ft. Vertical TD: 7786 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/12/2012 | | Proposed Top PZ Location: | Sec:3 Twp: 2N 65W | Footage: 1150 FNL 50 FWL | | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 1150 FNL 50 FWL | | Proposed Depth/Form: | 7834 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: , Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7834 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7834 ft. | | Casing: | String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 7/26/2011 | | Spud Date: | 7/22/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7915 ft. | Measured PB depth: | 7889 ft. | | True Vertical TD: | 7786 ft. | True Vertical PB depth: | 7760 ft. | | Top PZ Location: | Sec:3 Twp: 2N 65W | Footage: 1132 FNL 87 FWL | | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 1143 FNL 104 FWL | | Log Types: | AC-TR-SD-DSN; CBL 8-22-11; CBL 10-27-11 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 743 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 14 ft., Bottom: 743 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7909 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 7150 ft., Bottom: 7909 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 950 ft., Depth: 5454 ft., Bottom: 5500 ft., Sacks: 684, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 6770 ft., Depth: 6810 ft., Bottom: 7150 ft., Sacks: 100, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3957 ft. | 4228 ft. | | | | SUSSEX | 4346 ft. | 4678 ft. | | | | NIOBRARA | 7035 ft. | | | | | FORT HAYS | 7272 ft. | | | | | CODELL | 7292 ft. | | | | | J SAND | 7749 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 11/1/2019 Interval Top: 7776 ft. Interval Bottom: 7790 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/2011 | | Treatment Summary: | 10/30/11 -Set CIBP @ 7378' w/ 2 sks sand. Treated formation but has not produced this formation to sales yet.
09/01/11 -Frac J-Sand down 4-1/2" Csg w/ 143,241 gal Slickwater w/ 114,264# 40/70, 3,700# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7776 ft. | # Of Holes: | 56 | | Interval Bottom: | 7790 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2020 Interval Top: 7044 ft. Interval Bottom: 7308 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/16/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/7/2011 | | Treatment Summary: | NB PERF 7044-7308 HOLES 60 SIZE 0.38 CD PERF 7296-7308 HOLES 48 SIZE 0.38
Frac Niobrara w/ 250 gal 15% HCl & 244,948 gal Slickwater w/ 200,940# 40/70, 4,000# SB Excel
Frac Codell w/ 198,845 gal Slickwater w/ 150,140# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 6250 | | CALC_MCF_GAS | 125 | | CASING_PRESS | 944 | | GRAVITY_OIL | 54 | | MCF_GAS | 125 |
| | Perforation Data: | | Interval Top: | 7044 ft. | # Of Holes: | 108 | | Interval Bottom: | 7308 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|