|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/3/2023 Measured TD: 8149 ft. Vertical TD: 8051 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/3/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/19/2012 | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 83 FNL 1370 FEL | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 64 FNL 1370 FEL | Proposed Depth/Form: | 8038 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 630 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 630 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8038 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 7047 ft., Bottom: 8038 ft. |
| | |
Wellbore Completed | Completion Date: | 1/11/2011 | Spud Date: | 1/6/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8149 ft. | Measured PB depth: | 8064 ft. | True Vertical TD: | 8051 ft. | True Vertical PB depth: | 7966 ft. | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 83 FNL 1370 FEL | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 64 FNL 1370 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 778 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 345, Top: 0 ft., Bottom: 778 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 635, Top: 3744 ft., Bottom: 8129 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4272 ft. | | | | NIOBRARA | 7300 ft. | | | | CODELL | 7538 ft. | | | | J SAND | 7966 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/30/2022 Interval Top: 7976 ft. Interval Bottom: 7992 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/22/2011 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 7976'-7992' (32 HOLES) W/154,266 GAL 18 #VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,780 #20/40 SAND. 01/22/2011. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7976 ft. | # Of Holes: | 32 | Interval Bottom: | 7992 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 9/13/2022 Interval Top: 7538 ft. Interval Bottom: 7556 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/28/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7538 ft. | # Of Holes: | 36 | Interval Bottom: | 7556 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/14/2011 Interval Top: 7364 ft. Interval Bottom: 7992 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/14/2011 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @7180'. 04/06/11. DRILLED OUT CBP @7180'; CFP @7450' AND 7650' TO COMMINGLE THE JSND-CDL-NBRR. 04/07/11. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7943 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 19 | BBLS_OIL | 66 | BTU_GAS | 1216 | CALC_BBLS_H2O | 19 | CALC_BBLS_OIL | 66 | CALC_GOR | 3576 | CALC_MCF_GAS | 236 | CASING_PRESS | 1301 | GRAVITY_OIL | 49 | MCF_GAS | 236 | TUBING_PRESS | 949 |
| Perforation Data: | Interval Top: | 7364 ft. | # Of Holes: | 228 | Interval Bottom: | 7992 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/30/2022 Interval Top: 7364 ft. Interval Bottom: 7556 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/22/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7650'. 01/22/2011. FRAC'D THE CODELL 7538'-7556' (36 HOLES) W/112,153 GAL 22 #VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,740 #30/50 SAND. 01/22/11. SET CFP @7450'. 01/22/11. FRAC'D THE NIOBRARA "B" 7364'-7364' AND NIO "C" 7394'-7374' (160 HOLES), W/135,253 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 239,460 #30/50 SAND. 01/22/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7364 ft. | # Of Holes: | 196 | Interval Bottom: | 7556 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 9/13/2022 Interval Top: 7364 ft. Interval Bottom: 7374 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/28/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7364 ft. | # Of Holes: | 160 | Interval Bottom: | 7374 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 11/03/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|