|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/29/2023 Measured TD: 8095 ft. Vertical TD: 7983 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/29/2023 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 2/6/2012 | Proposed Top PZ Location: | Sec:30 Twp: 3N 66W | Footage: 41 FNL 1370 FWL | Bottom Hole Location: | Sec:30 Twp: 3N 66W | Footage: 42 FNL 1368 FWL | Proposed Depth/Form: | 8025 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 540 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 228, Top: 0 ft., Bottom: 540 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8025 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 521, Top: , Bottom: 8025 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 11/15/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8095 ft. | Measured PB depth: | 8038 ft. | True Vertical TD: | 7983 ft. | True Vertical PB depth: | 7927 ft. | Top PZ Location: | Sec:30 Twp: 3N 66W | Footage: 41 FNL 1370 FWL | Bottom Hole Location: | Sec:30 Twp: 3N 66W | Footage: 42 FNL 1368 FWL | Log Types: | CBL/CCL/GR, IND, DEN/NEU | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 607 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 343, Top: 0 ft., Bottom: 607 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8083 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 760, Top: 1816 ft., Bottom: 8083 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1490 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 296 ft., Bottom: 1490 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7122 ft. | | | | FORT HAYS | 7399 ft. | | | | CODELL | 7421 ft. | | | | D SAND | 7798 ft. | | | | MOWRY | 7845 ft. | | | | J SAND | 7853 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/29/2023 Interval Top: 7862 ft. Interval Bottom: 7906 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/5/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/5/2011 | Treatment Summary: | J SAND 7862-7906. FRAC'D J SAND W/146832 GALS SILVERSTIM AND SLICK WATER W/280420# OTTAWA SAND AND SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7862 ft. | # Of Holes: | 104 | Interval Bottom: | 7906 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: Status: CM - 9/1/2021 Interval Top: 7430 ft. Interval Bottom: 7440 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7430 ft. | # Of Holes: | 40 | Interval Bottom: | 7440 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/12/2011 Interval Top: 7206 ft. Interval Bottom: 7906 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 1/8/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2011 | Treatment Summary: | J Sand, Codell, and Niobrara are commingled; J Sand and Codell are each producing through composite flow through plugs.
J Sand 7862-7906, 104 holes, .41"
Frac'd J Sand w/146832 gals Silverstim and Slick Water with 280420 lbs Ottawa sand and SB Excel
Codell 7430-7440, 40 holes, .42"
Frac'd Codell w/131382 gals Silverstim, Acid, and Slick Water with 267940 lbs Ottawa sand
Niobrara 7206-7305, 48 holes, .72"
Frac'd Niobrara w/176006 gals Silverstim and Slick Water with 249120 lbs Preferred Rock
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/12/2011 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 65 | BTU_GAS | 1248 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 65 | CALC_GOR | 3646 | CALC_MCF_GAS | 237 | CASING_PRESS | 900 | GRAVITY_OIL | 52 | MCF_GAS | 237 |
| Perforation Data: | Interval Top: | 7206 ft. | # Of Holes: | 192 | Interval Bottom: | 7906 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/29/2023 Interval Top: 7206 ft. Interval Bottom: 7440 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/5/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/5/2011 | Treatment Summary: | NB 7206-7305 HOLE .72". FAC'D NB W/176006 GALS SILVERSTIM AND SLICK WATER W/249140 # PERFERRED ROCK.
CD 7430-7440,HOLE .42". FRAC'D CD W/131382 GALS SILVERSTIM, ACID AND SLICK WATER W/267940# OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7206 ft. | # Of Holes: | 88 | Interval Bottom: | 7440 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 9/1/2021 Interval Top: 7206 ft. Interval Bottom: 7350 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7206 ft. | # Of Holes: | 48 | Interval Bottom: | 7350 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
Reported Plugged | Y | 08/29/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|