|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/19/2023 Measured TD: 7548 ft. Vertical TD: 7256 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/19/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/10/2012 | Proposed Top PZ Location: | Sec:32 Twp: 3N 64W | Footage: 2532 FNL 1291 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 64W | Footage: 2536 FNL 1286 FEL | Proposed Depth/Form: | 7935 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: S/2NE/4, N/2SE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: S/2NE/4, N/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 740 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 370, Top: 0 ft., Bottom: 740 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7935 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 760, Top: , Bottom: 7935 ft. |
| | |
Wellbore Completed | Completion Date: | 7/19/2011 | Spud Date: | 7/14/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7548 ft. | Measured PB depth: | 7494 ft. | True Vertical TD: | 7256 ft. | True Vertical PB depth: | 7202 ft. | Top PZ Location: | Sec:32 Twp: 3N 64W | Footage: 2532 FNL 1291 FEL | Bottom Hole Location: | Sec:32 Twp: 3N 64W | Footage: 2536 N 1286 E | Log Types: | CBL/GRL/CCL
No open hole logs were run. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 819 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 819 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7538 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 630, Top: 850 ft., Bottom: 7538 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7044 ft. | | | | FORT HAYS | 7323 ft. | | | | CODELL | 7347 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 12/21/2020 Interval Top: 7348 ft. Interval Bottom: 7360 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/3/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7348 ft. | # Of Holes: | 48 | Interval Bottom: | 7360 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/19/2023 Interval Top: 7116 ft. Interval Bottom: 7360 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/3/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/31/2011 | Treatment Summary: | Frac'd the Niobrara-Codell w/ 274155 gals of Silverstim and Slick Water with 505,000#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 111 | BTU_GAS | 1345 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 111 | CALC_GOR | 2081 | CALC_MCF_GAS | 231 | CASING_PRESS | 860 | GRAVITY_OIL | 46 | MCF_GAS | 231 |
| Perforation Data: | Interval Top: | 7116 ft. | # Of Holes: | 96 | Interval Bottom: | 7360 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/21/2020 Interval Top: 7116 ft. Interval Bottom: 7230 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/3/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7116 ft. | # Of Holes: | 48 | Interval Bottom: | 7230 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 09/19/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|