|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/17/2023 Measured TD: 7833 ft. Vertical TD: 7516 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/17/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/3/2011 | | Proposed Top PZ Location: | Sec:30 Twp: 3 66 | Footage: 2570 FNL 2554 FWL | | Bottom Hole Location: | Sec:30 Twp: 3 66 | Footage: 2572 FNL 2553 FWL | | Proposed Depth/Form: | 7777 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/20/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7833 ft. | Measured PB depth: | 7760 ft. | | True Vertical TD: | 7516 ft. | True Vertical PB depth: | 7445 ft. | | Top PZ Location: | Sec:30 Twp: 3 66 | Footage: 2570 FNL 2554 FWL | | Bottom Hole Location: | Sec:30 Twp: 3 66 | Footage: 2572 FNL 2553 FWL | | Log Types: | CBL, CD/CN/ML, DIL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 671 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 289, Top: 0 ft., Bottom: 671 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7804 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 785, Top: 1961 ft., Bottom: 7804 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1334 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 288 ft., Bottom: 1336 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6692 ft. | | N | N | | FORT HAYS | 7631 ft. | | N | N | | CODELL | 7654 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/25/2010 Interval Top: 7658 ft. Interval Bottom: 7672 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | FRAC'D CD W/149043 GAL VISTAR ABD SLICKWATER W/269120#'S OTTAWA SAND. CD IS PRODUCING THROUGH A CAST IRON FLOW THROUGH PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7658 ft. | # Of Holes: | 56 | | Interval Bottom: | 7672 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/25/2010 Interval Top: 7444 ft. Interval Bottom: 7520 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | FRAC'D NB W/172860 GALS VISTAR AND SLICKWATER W/247180#'S OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7444 ft. | # Of Holes: | 48 | | Interval Bottom: | 7520 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/17/2023 Interval Top: 7400 ft. Interval Bottom: 7672 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/17/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | COMMINGLE NB & CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 85 | | BTU_GAS | 1266 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 85 | | CALC_GOR | 2424 | | CALC_MCF_GAS | 206 | | CASING_PRESS | 750 | | GRAVITY_OIL | 60 | | MCF_GAS | 206 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 104 | | Interval Bottom: | 7672 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/17/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|