Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30716
Well Classification: GW Status: PR - 10/1/2023
Well Name/No:CAMP #41-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2023
FacilityID:414287LocationID:336160
County:WELD #123Location:SENE 24 3N67W 6
Field:WATTENBERG - #90750Elevation:4796 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2246FNL  372 FELLat/Long: 40.211070 / -104.831250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.211078 / -104.831262Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/7/2011
End Date: 9/7/2011
Reported: 10/25/2011
Prior to rule 205A.b.(2)(A)
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2023             Measured TD: 8023 ft.    Vertical TD: 7901 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2023
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:10/28/2011
Proposed Top PZ Location:Sec:24 Twp: 3N 67W Footage: 1313 FNL  73 FEL
Bottom Hole Location:Sec:24 Twp: 3N 67W Footage: 1309 FNL  63 FEL
Proposed Depth/Form:7999 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 595, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7579 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7579 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:1/19/2010Spud Date Is:ACTUAL
Measured TD:8023 ft.Measured PB depth:7980 ft.
True Vertical TD:7901 ft.True Vertical PB depth:7858 ft.
Top PZ Location:Sec:24 Twp: 3N 67WFootage: 1313 FNL  73 FEL
Bottom Hole Location:Sec:24 Twp: 3N 67WFootage: 1309 FNL  63 FEL
Log Types:P/E AILC-CNLD-ML, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 877 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 877 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 6540 ft., Bottom: 8014 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 408 ft., Depth: 7794 ft., Bottom: 900 ft., Sacks: 110, Method: 1 INCH
Additional Cement:String Type: SURF , Top: 1118 ft., Depth: , Bottom: 5380 ft., Sacks: 584, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3839 ft.
SUSSEX4333 ft.
SHANNON4894 ft.
NIOBRARA7127 ft.
FORT HAYS7390 ft.
CODELL7410 ft.
J SAND7857 ft.

Formation JSND                     Formation Classification:  OW                     Status:  PR - 10/1/2023                 Interval Top: 7854 ft.    Interval Bottom: 7896 ft.

 Completed Information for Formation J SAND
1st Production Date:9/20/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 166,328 gal Slickwater w/ 159,140# 40/70, 4,080# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7854 ft.# Of Holes:64
Interval Bottom:7896 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/9/2011                 Interval Top: 7150 ft.    Interval Bottom: 7896 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:9/20/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2011
Treatment Summary:JSND REC
Tubing Size:2.375 in.Tubing Setting Depth:7809 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1231
CALC_BBLS_OIL 1
CALC_GOR 11000
CALC_MCF_GAS 11
CASING_PRESS 880
GRAVITY_OIL 40
MCF_GAS 11
TUBING_PRESS 433
Perforation Data:
Interval Top:7150 ft.# Of Holes:182
Interval Bottom:7896 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 10/1/2023                 Interval Top: 7150 ft.    Interval Bottom: 7430 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/1/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2010
Treatment Summary:NBRR PERF 7150-7272 HOLES 64 SIZE 0.42 CODL PERF 7412-7430 HOLES 54 SIZE 0.38 FRAC NBRR W/ 500 GAL 15% HC1 &229551 GAL SW & 200880# 40/70 SAND & 4000# SUPERLC. FRAC CODL W/ 142388 GAL DYNAFLOW 2 &220180# 20/40 SAND & 4000#2040 SUPERLC.
Tubing Size:2.375 in.Tubing Setting Depth:7401 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/23/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1320
CALC_BBLS_OIL 67
CALC_GOR 2493
CALC_MCF_GAS 167
CASING_PRESS 9
GRAVITY_OIL 50
TUBING_PRESS 550
Perforation Data:
Interval Top:7150 ft.# Of Holes:118
Interval Bottom:7430 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)88
GOR
GOR DeterminationMCFE
Average BOE per Day0.044
Average MCFE per Day0.241

 Federal Financial Assurance  i 

 Tribal Well  i No