|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2021 Measured TD: 8055 ft. Vertical TD: 7764 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/13/2011 | | Proposed Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 2533 FNL 1433 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 65W | Footage: 2521 FNL 1409 FEL | | Proposed Depth/Form: | 8053 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8053 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8053 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/19/2010 | | Spud Date: | 8/15/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8055 ft. | Measured PB depth: | 8003 ft. | | True Vertical TD: | 7764 ft. | True Vertical PB depth: | 7712 ft. | | Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 2533 FNL 1433 FEL | | Bottom Hole Location: | Sec:33 Twp: 3N 65W | Footage: 2521 FNL 1409 FEL | | Log Types: | VDL-CCL-GR-CBL, DI-GL-GR, CD-CN-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 834 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 834 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8038 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1270, Top: 1410 ft., Bottom: 8038 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4613 ft. | | | | | NIOBRARA | 7170 ft. | | | | | CODELL | 7446 ft. | | | | | J SAND | 7898 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 3/1/2019 Interval Top: 7914 ft. Interval Bottom: 7952 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/1/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | Frac JSND w/ 148,932 gal SW & 115,620# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 24 | | BTU_GAS | 1279 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 3542 | | CALC_MCF_GAS | 85 | | CASING_PRESS | 2325 | | GRAVITY_OIL | 53 | | MCF_GAS | 85 |
| | Perforation Data: | | Interval Top: | 7914 ft. | # Of Holes: | 60 | | Interval Bottom: | 7952 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2021 Interval Top: 7219 ft. Interval Bottom: 7464 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/1/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | NBRR Perf 7219-7330 Holes 60 Size 0.42 CODL Perf 7450-7464 Holes 56 Size 0.42
Frac NBRR w/ 250 gal 15% HCl & 253,888 gal SW & 200,980# 40/70 sand & 4,000# SB Excel.
Frac CODL w/ 202,558 gal SW & 150,400# 40/70 sand & 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1279 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 3440 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 2325 | | GRAVITY_OIL | 53 | | MCF_GAS | 86 |
| | Perforation Data: | | Interval Top: | 7219 ft. | # Of Holes: | 116 | | Interval Bottom: | 7464 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/28/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|