|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/24/2022 Measured TD: 7840 ft. Vertical TD: 7733 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/24/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20083028 | Expiration Date: | 7/15/2009 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2607 FNL 1326 FEL | Bottom Hole Location: | Sec:16 Twp: 2N 67W | Footage: 2607 FNL 1326 FEL | Proposed Depth/Form: | 7840 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 10/22/2008 | Spud Date: | 10/17/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7840 ft. | Measured PB depth: | 7821 ft. | True Vertical TD: | 7733 ft. | True Vertical PB depth: | 7714 ft. | Top PZ Location: | Sec:16 Twp: 2N 67W | Footage: 2594 FNL 1359 FEL | Bottom Hole Location: | Sec:16 Twp: 2N 67W | Footage: 2594 N 1359 E | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 663 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 318, Top: 0 ft., Bottom: 663 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7838 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1050, Top: 1113 ft., Bottom: 7838 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2721 ft. | | N | N | PARKMAN | 4104 ft. | | N | N | SUSSEX | 4604 ft. | | N | N | SHANNON | 5114 ft. | | N | N | TEEPEE BUTTES | 6456 ft. | | N | N | NIOBRARA | 7394 ft. | | N | N | FORT HAYS | 7669 ft. | | N | N | CODELL | 7690 ft. | | N | N | GREENHORN | 7735 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/19/2008 Interval Top: 7692 ft. Interval Bottom: 7711 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/10/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/24/2008 | Treatment Summary: | CODL FRAC'D W/ 1,017 GALS 15% HCI ACID; 4,139 GALS SLICKWATER; 141,162 GALS SILVERSTIM & 263,676# 20/40 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7692 ft. | # Of Holes: | 76 | Interval Bottom: | 7711 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/24/2022 Interval Top: 7477 ft. Interval Bottom: 7711 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/10/2008 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/22/2008 | Treatment Summary: | COMMINGLE THE NBRR & CODL. CODELL PRODUCING THROUGH CAST IRON FLOW PLUG FROM 1ST PRODUCTION DATE OF 12/10/08 UNTIL TUBING WAS LANDED ON 1/23/09. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7680 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/19/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 61 | BTU_GAS | 1171 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 61 | CALC_GOR | 3738 | CALC_MCF_GAS | 228 | CASING_PRESS | 400 | GRAVITY_OIL | 48 | MCF_GAS | 228 |
| Perforation Data: | Interval Top: | 7477 ft. | # Of Holes: | 108 | Interval Bottom: | 7711 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/19/2008 Interval Top: 7477 ft. Interval Bottom: 7493 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/10/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/24/2008 | Treatment Summary: | NBRR FRAC'D W/ 74,873 GAS SLICKWATER; 111,998 GALS SILVERSTIM; & 253,243# 20/40 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7477 ft. | # Of Holes: | 32 | Interval Bottom: | 7493 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
Reported Plugged | Y | 05/24/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|