|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2017 Measured TD: 7940 ft. Vertical TD: 7833 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/29/2010 | Proposed Top PZ Location: | Sec:29 Twp: 3N 65W | Footage: 1350 FSL 2450 FWL | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 1365 FSL 2434 FWL | Proposed Depth/Form: | 7940 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 765 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 330, Top: 16 ft., Bottom: 766 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7926 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 605, Top: 3190 ft., Bottom: 7926 ft. |
| | |
Wellbore Completed | Completion Date: | 5/24/2008 | Spud Date: | 5/19/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7940 ft. | Measured PB depth: | 7905 ft. | True Vertical TD: | 7833 ft. | True Vertical PB depth: | 7798 ft. | Top PZ Location: | Sec:29 Twp: 3N 65W | Footage: 1350 FSL 2450 FWL | Bottom Hole Location: | Sec:29 Twp: 3N 65W | Footage: 1365 FSL 2434 FWL | Log Types: | CBL, P/E AILC-CNLD-ML-SPDT | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 765 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 765 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7924 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 605, Top: 3130 ft., Bottom: 7924 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3968 ft. | 4133 ft. | N | N | SUSSEX | 4380 ft. | 4420 ft. | N | N | TEEPEE BUTTES | 6218 ft. | | N | N | NIOBRARA | 7054 ft. | | N | N | FORT HAYS | 7322 ft. | | N | N | CODELL | 7342 ft. | | N | N | J SAND | 7796 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 5/1/2017 Interval Top: 7796 ft. Interval Bottom: 7852 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/6/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2010 | Treatment Summary: | FRAC JSND W/163,464 GAL SW & 115,060# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7760 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/21/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1292 | CALC_BBLS_OIL | 5 | CALC_GOR | 17000 | CALC_MCF_GAS | 85 | CASING_PRESS | 539 | GRAVITY_OIL | 52 | TUBING_PRESS | 378 |
| Perforation Data: | Interval Top: | 7796 ft. | # Of Holes: | 60 | Interval Bottom: | 7852 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/7/2010 Interval Top: 7342 ft. Interval Bottom: 7358 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/22/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2008 | Treatment Summary: | 167396 GALS FLUID & 88500 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7342 ft. | # Of Holes: | 64 | Interval Bottom: | 7358 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2017 Interval Top: 7058 ft. Interval Bottom: 7358 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/22/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2010 | Treatment Summary: | NBRR PERF 7058-7214 HOLES 120 SIZE 0.42. CODL PERF 7342-7358 HOLES 64 SIZE 0.38. NO ADDITIONAL TREATMENT. | Formation Treatment | Treatment Date: | 5/24/2008 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7760 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/21/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1292 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 5 | CALC_GOR | 17000 | CALC_MCF_GAS | 85 | CASING_PRESS | 539 | GRAVITY_OIL | 52 | TUBING_PRESS | 378 |
| Perforation Data: | Interval Top: | 7058 ft. | # Of Holes: | 184 | Interval Bottom: | 7358 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/7/2010 Interval Top: 7058 ft. Interval Bottom: 7214 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/22/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2008 | Treatment Summary: | 1500 GALS ACID & 349874 GALS FLUID & 268053 LBS 30/50 SAND & 12000 LBS 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7058 ft. | # Of Holes: | 120 | Interval Bottom: | 7214 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 04/30/2017 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|