Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25592
Well Classification: GW Status: PA - 10/8/2025
Well Name/No:ISHIGURO #17-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/8/2025
FacilityID:274859LocationID:332571
Municipality/County:EVANS / WELD #123Location:NWNE 36 5N66W 6
Field:WATTENBERG - #90750Elevation:4660 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1100FNL  1450 FELLat/Long: 40.359985 / -104.720950Lat/Long Source: Calculated From Footages
As Drilled Location:1111 FNL  1450 FELLat/Long: 40.360030 / -104.720920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/8/2025             Measured TD: 7296 ft.    Vertical TD: 7296 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/8/2025
Wellbore Permit
Permit #:20042620 Expiration Date:11/22/2005
Proposed Depth/Form:7275 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:2/28/2005
Spud Date:2/9/2005Spud Date Is:ACTUAL
Measured TD:7296 ft.Measured PB depth:7298 ft.
True Vertical TD:7296 ft.True Vertical PB depth:7298 ft.
Log Types:CBL, GR, CDCN,DIGL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 768 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 768 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7314 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 3710 ft., Bottom: 7314 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4230 ft.NN
NIOBRARA6808 ft.NN
FORT HAYS7106 ft.NN
CODELL7129 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/18/2008                 Interval Top: 7129 ft.    Interval Bottom: 7144 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2005
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_H2O 0
CALC_BBLS_OIL 6
CALC_GOR 18000
CALC_MCF_GAS 108
CASING_PRESS 654
GRAVITY_OIL 60
MCF_GAS 108
TUBING_PRESS 482
Perforation Data:
Interval Top:7129 ft.# Of Holes:60
Interval Bottom:7144 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/8/2025                 Interval Top: 6814 ft.    Interval Bottom: 7144 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/15/2007Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2005
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7105 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1275
CALC_BBLS_H2O 0
CALC_BBLS_OIL 11
CALC_GOR 15272
CALC_MCF_GAS 168
CASING_PRESS 810
GRAVITY_OIL 51
TUBING_PRESS 590
Perforation Data:
Interval Top:6814 ft.# Of Holes:223
Interval Bottom:7144 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/18/2008                 Interval Top: 6814 ft.    Interval Bottom: 7039 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2007
Treatment Summary:FRAC NBRR B & C W/244,550 GAL SLICKWATER & 187,598# 30/50 SAND. FRAC NBRR A W/128,715 GAL SLICKWATER, 96,520# 30/50 SAND AND 4,151# RESIN COATED SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6814 ft.# Of Holes:163
Interval Bottom:7039 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/08/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/27/2025
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No