|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/26/2023 Measured TD: 7587 ft. Vertical TD: 7487 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/26/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20062302 | Expiration Date: | 7/23/2007 | | Proposed Top PZ Location: | Sec:6 Twp: 3N 66W | Footage: 1387 FSL 2491 FWL | | Bottom Hole Location: | Sec:6 Twp: 3N 66W | Footage: 1387 FSL 2491 FWL | | Proposed Depth/Form: | 7534 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/14/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7587 ft. | Measured PB depth: | 7541 ft. | | True Vertical TD: | 7487 ft. | True Vertical PB depth: | 7441 ft. | | Top PZ Location: | Sec:6 Twp: 3N 66W | Footage: 1387 FSL 2491 FWL | | Bottom Hole Location: | Sec:6 Twp: 3N 66W | Footage: 1387 FSL 2491 FWL | | Log Types: | CBL-CDL-CNL-ML-IEL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 581 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7557 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 3555 ft., Bottom: 7557 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3894 ft. | | N | N | | SUSSEX | 4157 ft. | | N | N | | SHANNON | 4890 ft. | | N | N | | NIOBRARA | 7091 ft. | | N | N | | FORT HAYS | 7377 ft. | | N | N | | CODELL | 7399 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 5/26/2023 Interval Top: 7399 ft. Interval Bottom: 7419 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/21/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/26/2007 | | Treatment Summary: | 177,619 GALS FLUID & 115,920 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7399 ft. | # Of Holes: | 60 | | Interval Bottom: | 7419 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/26/2023 Interval Top: 7124 ft. Interval Bottom: 7419 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/21/2007 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/21/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7383 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | BTU_GAS | 1277 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 24000 | | CALC_MCF_GAS | 120 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 53 | | MCF_GAS | 120 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 172 | | Interval Bottom: | 7419 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/26/2023 Interval Top: 7124 ft. Interval Bottom: 7286 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/21/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/30/2007 | | Treatment Summary: | 240,186 GALS FLUID & 200,480 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7124 ft. | # Of Holes: | 112 | | Interval Bottom: | 7286 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/26/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|