Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23662
Well Classification: GW Status: PA - 2/18/2020
Well Name/No:BROWN #23-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/18/2020
FacilityID:283613LocationID:336700
County:WELD #123Location:SWSE 1 3N67W 6
Field:WATTENBERG - #90750Elevation:4785 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:808FSL  1916 FELLat/Long: 40.248701 / -104.836581Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.248692 / -104.836698Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/18/2020             Measured TD: 7549 ft.    Vertical TD: 7509 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/18/2020
Wellbore PermitDIRECTIONAL
Permit #:20055047 Expiration Date:3/5/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1410 FSL  2630 FEL
Bottom Hole Location:Sec:1 Twp: 3N 67W Footage: 1410 FSL  2630 FEL
Proposed Depth/Form:7657 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: ALL

Wellbore Completed
Completion Date:N/A
Spud Date:3/23/2006Spud Date Is:ACTUAL
Measured TD:7549 ft.Measured PB depth:7549 ft.
True Vertical TD:7509 ft.True Vertical PB depth:7395 ft.
Top PZ Location:Sec:1 Twp: 3N 67WFootage: 1396 FSL  2659 FEL
Bottom Hole Location:Sec:1 Twp: 3N 67WFootage: 1396 FSL  2659 FEL
Log Types:CNLD,CBL,PEML,AILC
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 784 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 784 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7540 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 3570 ft., Bottom: 7540 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3570 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 790 ft., Bottom: 3570 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3817 ft.NN
SUSSEX4281 ft.NN
SHANNON4853 ft.NN
NIOBRARA7089 ft.NN
FORT HAYS7364 ft.NN
CODELL7388 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/20/2006                 Interval Top: 7389 ft.    Interval Bottom: 7408 ft.

 Completed Information for Formation CODELL
1st Production Date:5/15/2006Choke Size:0.281 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:106,602 GALS FLUID & 205,660 LBS 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7363 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 17
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_GOR 10300
CALC_MCF_GAS 175
CASING_PRESS 1400
GRAVITY_OIL 52
MCF_GAS 175
TUBING_PRESS 1100
Perforation Data:
Interval Top:7389 ft.# Of Holes:57
Interval Bottom:7408 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/18/2020                 Interval Top: 7100 ft.    Interval Bottom: 7408 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/8/2010Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/2009
Treatment Summary:NB PERF 7100-7270 HOLES 70 SIZE 0.42 CD PERF 7389-7408 HOLES 57 SIZE 0.38 FRAC NB W/ 500 GAL 15% HCL & 238,934 GAL SW W/ 200,380# 40/70 & 4,160# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7366 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1281
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 8875
CALC_MCF_GAS 71
CASING_PRESS 1500
GRAVITY_OIL 47
TUBING_PRESS 1100
Perforation Data:
Interval Top:7100 ft.# Of Holes:127
Interval Bottom:7408 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/18/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No