Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23043
Well Classification: OW Status: PA - 4/14/2014
Well Name/No:STREAR #13-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/14/2014
FacilityID:278317LocationID:305488
County:WELD #123Location:SWSW 10 2N67W 6
Field:WATTENBERG - #90750Elevation:4990 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  470 FWLLat/Long: 40.146627 / -104.884483Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.146770 / -104.884240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/14/2014             Measured TD: 7734 ft.    Vertical TD: 7734 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/14/2014
Wellbore Permit
Permit #:20051750 Expiration Date:6/15/2006
Proposed Depth/Form:7735 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SW

Wellbore Completed
Completion Date:7/26/2005
Spud Date:7/15/2005Spud Date Is:ACTUAL
Measured TD:7734 ft.Measured PB depth:7697 ft.
True Vertical TD:7734 ft.True Vertical PB depth:7697 ft.
Log Types:CBL, CDCN, GR, DIGL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 899 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 899 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7710 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 3476 ft., Bottom: 7713 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4482 ft.NN
SHANNON5020 ft.NN
NIOBRARA7310 ft.NN
FORT HAYS7551 ft.NN
CODELL7573 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/14/2014                 Interval Top: 7574 ft.    Interval Bottom: 7592 ft.

 Completed Information for Formation CODELL
1st Production Date:7/2/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2010
Treatment Summary:CORRECTION TO FORM 5A SUBMITTED 12/11/09. SET CIBP 9/3/09 @7540' & DRILLED OUT 6/21/10. CD STATUS: TA 9/3/09-6/21/10. CD COMMINGLED W/NB 7/2/10.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 32
CALC_BBLS_H2O 0
CALC_BBLS_OIL 32
CALC_GOR 3540
CALC_MCF_GAS 113
CASING_PRESS 827
GRAVITY_OIL 49
MCF_GAS 113
TUBING_PRESS 690
Perforation Data:
Interval Top:7574 ft.# Of Holes:54
Interval Bottom:7592 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/14/2014                 Interval Top: 7362 ft.    Interval Bottom: 7592 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/2/2010Choke Size:0.438 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2010
Treatment Summary:NB PERF 7362-7443, HOLES 72 SIZE 0.38. CD PERS 7574-7592, HOLES 54 SIZE 0.38. CORRECTION TO FORM 5A SUBMITTED 12/11/09.
Tubing Size:2.375 in.Tubing Setting Depth:7542 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1333
CALC_BBLS_H2O 0
CALC_BBLS_OIL 14
CALC_GOR 2357
CALC_MCF_GAS 33
CASING_PRESS 609
GRAVITY_OIL 48
TUBING_PRESS 440
Perforation Data:
Interval Top:7362 ft.# Of Holes:126
Interval Bottom:7592 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/14/2014                 Interval Top: 7362 ft.    Interval Bottom: 7443 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/28/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/9/2009
Treatment Summary:FRAC NB W/246743 GAL SW & 200460# SAND & 4000# 20/40 SB EXCEL. CORRECTION TO FORM 5A SUBMITTED 12/11/09. NB STATUS: PROD 9/28/09-7/1/10. NB COMMINGLED W/CD 7/2/10.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7362 ft.# Of Holes:72
Interval Bottom:7443 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/14/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No