|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/14/2014 Measured TD: 7734 ft. Vertical TD: 7734 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/14/2014 | | Wellbore Permit | | | Permit #: | 20051750 | Expiration Date: | 6/15/2006 | | Proposed Depth/Form: | 7735 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SW |
| | |
| Wellbore Completed | | Completion Date: | 7/26/2005 | | Spud Date: | 7/15/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7734 ft. | Measured PB depth: | 7697 ft. | | True Vertical TD: | 7734 ft. | True Vertical PB depth: | 7697 ft. | | Log Types: | CBL, CDCN, GR, DIGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 899 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 899 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7710 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 3476 ft., Bottom: 7713 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4482 ft. | | N | N | | SHANNON | 5020 ft. | | N | N | | NIOBRARA | 7310 ft. | | N | N | | FORT HAYS | 7551 ft. | | N | N | | CODELL | 7573 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 4/14/2014 Interval Top: 7574 ft. Interval Bottom: 7592 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/2/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2010 | | Treatment Summary: | CORRECTION TO FORM 5A SUBMITTED 12/11/09. SET CIBP 9/3/09 @7540' & DRILLED OUT 6/21/10. CD STATUS: TA 9/3/09-6/21/10. CD COMMINGLED W/NB 7/2/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 32 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 3540 | | CALC_MCF_GAS | 113 | | CASING_PRESS | 827 | | GRAVITY_OIL | 49 | | MCF_GAS | 113 | | TUBING_PRESS | 690 |
| | Perforation Data: | | Interval Top: | 7574 ft. | # Of Holes: | 54 | | Interval Bottom: | 7592 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/14/2014 Interval Top: 7362 ft. Interval Bottom: 7592 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/2/2010 | Choke Size: | 0.438 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2010 | | Treatment Summary: | NB PERF 7362-7443, HOLES 72 SIZE 0.38. CD PERS 7574-7592, HOLES 54 SIZE 0.38. CORRECTION TO FORM 5A SUBMITTED 12/11/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7542 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/13/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1333 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 2357 | | CALC_MCF_GAS | 33 | | CASING_PRESS | 609 | | GRAVITY_OIL | 48 | | TUBING_PRESS | 440 |
| | Perforation Data: | | Interval Top: | 7362 ft. | # Of Holes: | 126 | | Interval Bottom: | 7592 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/14/2014 Interval Top: 7362 ft. Interval Bottom: 7443 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/28/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/9/2009 | | Treatment Summary: | FRAC NB W/246743 GAL SW & 200460# SAND & 4000# 20/40 SB EXCEL. CORRECTION TO FORM 5A SUBMITTED 12/11/09. NB STATUS: PROD 9/28/09-7/1/10. NB COMMINGLED W/CD 7/2/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7362 ft. | # Of Holes: | 72 | | Interval Bottom: | 7443 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/14/2014 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|