|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/8/2024 Measured TD: 7275 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/8/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 20031726 | Expiration Date: | 9/29/2004 | | Proposed Depth/Form: | 7250 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 10/29/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7275 ft. | Measured PB depth: | 7242 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGLGR, CDCNGR, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 505, Top: 0 ft., Bottom: 722 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7268 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 3300 ft., Bottom: 7268 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1420 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 194 ft., Bottom: 1420 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 280 ft., Depth: 1500 ft., Bottom: 1410 ft., Sacks: 220, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4040 ft. | | N | N | | SHANNON | 4540 ft. | | N | N | | NIOBRARA | 6839 ft. | | N | N | | FORT HAYS | 7088 ft. | | N | N | | CODELL | 7110 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 3/8/2024 Interval Top: 6848 ft. Interval Bottom: 7126 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/27/2010 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/22/2010 | | Treatment Summary: | NB PERF 6848-6910 HOLES 66 SIZE 0.41, CD PERF 7110-7126 HOLES 60 SIZE 0.38 NB TREATED W/ 546 GAL 15% HCI & 238,770 GAL SW W/200,640 # 40/70 & 4060# 20/40 SB EXCEL. CD TREATED W/121800 VISTAR W/262,020# 20/40 & 4,140# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/11/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 37 | | BTU_GAS | 1351 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4579 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 4 | | GRAVITY_OIL | 44 | | MCF_GAS | 99 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 6848 ft. | # Of Holes: | 126 | | Interval Bottom: | 7126 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/08/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|