Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21701
Well Classification: GW Status: PA - 3/8/2024
Well Name/No:DAVIS #12-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/8/2024
FacilityID:269608LocationID:332005
County:WELD #123Location:NWSW 15 3N67W 6
Field:WATTENBERG - #90750Elevation:4795 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2000FSL  600 FWLLat/Long: 40.223946 / -104.884074Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.223979 / -104.884036Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 3/8/2024             Measured TD: 7275 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 3/8/2024
Wellbore PermitDRIFTED
Permit #:20031726 Expiration Date:9/29/2004
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:N/A
Spud Date:10/29/2003Spud Date Is:ACTUAL
Measured TD:7275 ft.Measured PB depth:7242 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGLGR, CDCNGR, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 722 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7268 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 3300 ft., Bottom: 7268 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1420 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 194 ft., Bottom: 1420 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 280 ft., Depth: 1500 ft., Bottom: 1410 ft., Sacks: 220, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4040 ft.NN
SHANNON4540 ft.NN
NIOBRARA6839 ft.NN
FORT HAYS7088 ft.NN
CODELL7110 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/8/2024                  Interval Top: 6848 ft.    Interval Bottom: 7126 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/27/2010Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/22/2010
Treatment Summary:NB PERF 6848-6910 HOLES 66 SIZE 0.41, CD PERF 7110-7126 HOLES 60 SIZE 0.38 NB TREATED W/ 546 GAL 15% HCI & 238,770 GAL SW W/200,640 # 40/70 & 4060# 20/40 SB EXCEL. CD TREATED W/121800 VISTAR W/262,020# 20/40 & 4,140# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 37
BTU_GAS 1351
CALC_BBLS_H2O 0
CALC_BBLS_OIL 19
CALC_GOR 4579
CALC_MCF_GAS 87
CASING_PRESS 4
GRAVITY_OIL 44
MCF_GAS 99
TUBING_PRESS 450
Perforation Data:
Interval Top:6848 ft.# Of Holes:126
Interval Bottom:7126 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/08/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No