|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/15/2019 Measured TD: 8500 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/15/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 5/28/2013 | Proposed Top PZ Location: | Sec:25 Twp: 1N 66W | Footage: 2007 FSL 524 FWL | Bottom Hole Location: | Sec:25 Twp: 1N 66W | Footage: 2007 FSL 524 FWL | Proposed Depth/Form: | 8500 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 545, Top: 0 ft., Bottom: 1381 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 7010 ft., Bottom: 8500 ft. |
| | |
Wellbore Completed | Completion Date: | 9/10/2003 | Spud Date: | 8/23/2003 | Spud Date Is: | ACTUAL | Measured TD: | 8500 ft. | Measured PB depth: | 8483 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:25 Twp: 1N 66W | Footage: 2007 FSL 524 FWL | Bottom Hole Location: | Sec:25 Twp: 1N 66W | Footage: 2007 S 524 W | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 545, Top: 0 ft., Bottom: 1381 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 7010 ft., Bottom: 8500 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4919 ft. | | N | N | NIOBRARA | 7436 ft. | | N | N | FORT HAYS | 7741 ft. | | N | N | CODELL | 7764 ft. | | N | N | CARLILE | 7781 ft. | | N | N | GREENHORN | 7826 ft. | | N | N | BENTONITE | 8034 ft. | | N | N | MOWRY | 8188 ft. | | N | N | J SAND | 8206 ft. | | N | N | SKULL CREEK | 8299 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/15/2019 Interval Top: 8206 ft. Interval Bottom: 8236 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/10/2003 | Treatment Summary: | FRAC'D THE J SAND W/160,400 GAL SLICK WATER CONTAINING 94,464# 20/40 SAND, 09/16/03 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 2 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 2 | CALC_GOR | 3500 | CALC_MCF_GAS | 7 | CASING_PRESS | 250 | MCF_GAS | 7 | TUBING_PRESS | 100 |
| Perforation Data: | Interval Top: | 8206 ft. | # Of Holes: | 96 | Interval Bottom: | 8236 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 3/8/2012 Interval Top: 7768 ft. Interval Bottom: 7778 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/10/2003 | Treatment Summary: | JSND-CD COMMINGLE PUMPED THE CODELL W/141,000 GALS FRAC FLUID AND 300,000# 20/40 FRAC SAND. 03/17/04 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8194 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/4/2004 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 35 | CALC_BBLS_H2O | 14 | CALC_BBLS_OIL | 35 | CALC_GOR | 4143 | CALC_MCF_GAS | 29 | CASING_PRESS | 1420 | MCF_GAS | 29 | TUBING_PRESS | 70 |
| Perforation Data: | Interval Top: | 7768 ft. | # Of Holes: | 40 | Interval Bottom: | 7778 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 8/31/2011 Interval Top: 7520 ft. Interval Bottom: 8236 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/31/2011 | Treatment Summary: | CIBP SET AT 7810' 08/13/2011, DRILLED OUT 8/23/2011. CFP SET @ 7570' 08/13/2011, DRILLED OUT 8/23/2011. PRODUCTION TUBING SET @ 8197'. COMMINGLED 08/23/2011. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8197 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/31/2011 | Test Method: | FLOWING | Hours Tested: | 3 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 40 | BTU_GAS | 1 | CALC_BBLS_H2O | 256 | CALC_BBLS_OIL | 320 | CALC_GOR | 1050 | CALC_MCF_GAS | 336 | CASING_PRESS | 1430 | GRAVITY_OIL | 43 | MCF_GAS | 42 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7520 ft. | # Of Holes: | 216 | Interval Bottom: | 8236 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/15/2019 Interval Top: 7520 ft. Interval Bottom: 7778 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/1/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/13/2011 | Treatment Summary: | NIOBRARA PERFS – 7520-7540’, 4 SPF, 80 HOLES. FRAC’D W/146,928 GALS FRAC FLUID AND 250,100
NIOBRARA PERFS – 7520-7540’, 4 SPF, 80 HOLES. FRAC’D W/146,928 GALS FRAC FLUID AND 250,100# SAND (08/13/2011). CODELL REFRAC – FRAC’D 7768’-7778’, W/122,874 GALS FLUID AND 250,040# FRAC SAND (08/13/2011). CIBP SET AT 7810’ 08/13/2011, DRILLED OUT 8/23/2011. CFP SET @ 7570’ 08/13/2011, DRILLED OUT 08/23/2011.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7520 ft. | # Of Holes: | 120 | Interval Bottom: | 7778 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 05/15/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|