Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21514
Well Classification: OW Status: PA - 5/15/2019
Well Name/No:SAM #13-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/15/2019
FacilityID:268060LocationID:335772
Municipality/County:LOCHBUIE / WELD #123Location:NESW 25 1N66W 6
Field:WATTENBERG - #90750Elevation:5076 ft.
Planned Location:1464FSL  1612 FWLLat/Long: 40.019052 / -104.729203Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.019052 / -104.729203Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2011
End Date: 8/13/2011
Reported: 2/28/2012
Prior to rule 205A.b.(2)(A)
Days to report: 199
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/15/2019             Measured TD: 8500 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/15/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/28/2013
Proposed Top PZ Location:Sec:25 Twp: 1N 66W Footage: 2007 FSL  524 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66W Footage: 2007 FSL  524 FWL
Proposed Depth/Form:8500 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 545, Top: 0 ft., Bottom: 1381 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7010 ft., Bottom: 8500 ft.

Wellbore Completed
Completion Date:9/10/2003
Spud Date:8/23/2003Spud Date Is:ACTUAL
Measured TD:8500 ft.Measured PB depth:8483 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:25 Twp: 1N 66WFootage: 2007 FSL  524 FWL
Bottom Hole Location:Sec:25 Twp: 1N 66WFootage: 2007 S  524 W
Log Types:CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1381 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 545, Top: 0 ft., Bottom: 1381 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8500 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 7010 ft., Bottom: 8500 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4919 ft.NN
NIOBRARA7436 ft.NN
FORT HAYS7741 ft.NN
CODELL7764 ft.NN
CARLILE7781 ft.NN
GREENHORN7826 ft.NN
BENTONITE8034 ft.NN
MOWRY8188 ft.NN
J SAND8206 ft.NN
SKULL CREEK8299 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/15/2019                 Interval Top: 8206 ft.    Interval Bottom: 8236 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/10/2003
Treatment Summary:FRAC'D THE J SAND W/160,400 GAL SLICK WATER CONTAINING 94,464# 20/40 SAND, 09/16/03
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 2
CALC_BBLS_H2O 2
CALC_BBLS_OIL 2
CALC_GOR 3500
CALC_MCF_GAS 7
CASING_PRESS 250
MCF_GAS 7
TUBING_PRESS 100
Perforation Data:
Interval Top:8206 ft.# Of Holes:96
Interval Bottom:8236 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/8/2012                  Interval Top: 7768 ft.    Interval Bottom: 7778 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/10/2003
Treatment Summary:JSND-CD COMMINGLE PUMPED THE CODELL W/141,000 GALS FRAC FLUID AND 300,000# 20/40 FRAC SAND. 03/17/04
Tubing Size:2.375 in.Tubing Setting Depth:8194 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 35
CALC_BBLS_H2O 14
CALC_BBLS_OIL 35
CALC_GOR 4143
CALC_MCF_GAS 29
CASING_PRESS 1420
MCF_GAS 29
TUBING_PRESS 70
Perforation Data:
Interval Top:7768 ft.# Of Holes:40
Interval Bottom:7778 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/31/2011                 Interval Top: 7520 ft.    Interval Bottom: 8236 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/31/2011
Treatment Summary:CIBP SET AT 7810' 08/13/2011, DRILLED OUT 8/23/2011. CFP SET @ 7570' 08/13/2011, DRILLED OUT 8/23/2011. PRODUCTION TUBING SET @ 8197'. COMMINGLED 08/23/2011.
Tubing Size:2.375 in.Tubing Setting Depth:8197 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2011Test Method:FLOWING
Hours Tested:3Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 40
BTU_GAS 1
CALC_BBLS_H2O 256
CALC_BBLS_OIL 320
CALC_GOR 1050
CALC_MCF_GAS 336
CASING_PRESS 1430
GRAVITY_OIL 43
MCF_GAS 42
TUBING_PRESS 200
Perforation Data:
Interval Top:7520 ft.# Of Holes:216
Interval Bottom:8236 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/15/2019                 Interval Top: 7520 ft.    Interval Bottom: 7778 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/1/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/13/2011
Treatment Summary:NIOBRARA PERFS – 7520-7540’, 4 SPF, 80 HOLES. FRAC’D W/146,928 GALS FRAC FLUID AND 250,100 NIOBRARA PERFS – 7520-7540’, 4 SPF, 80 HOLES. FRAC’D W/146,928 GALS FRAC FLUID AND 250,100# SAND (08/13/2011). CODELL REFRAC – FRAC’D 7768’-7778’, W/122,874 GALS FLUID AND 250,040# FRAC SAND (08/13/2011). CIBP SET AT 7810’ 08/13/2011, DRILLED OUT 8/23/2011. CFP SET @ 7570’ 08/13/2011, DRILLED OUT 08/23/2011.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7520 ft.# Of Holes:120
Interval Bottom:7778 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/15/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No