|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/12/2017 Measured TD: 7767 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/12/2017 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 10/20/2010 | | Proposed Depth/Form: | 7767 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 764 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 535, Top: 12 ft., Bottom: 764 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7760 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 215, Top: 6180 ft., Bottom: 7760 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4862 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 3790 ft., Bottom: 4862 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/12/2002 | | Spud Date: | 7/27/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7767 ft. | Measured PB depth: | 7746 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DIGLGR, CDCNM, CBL | | Casing: | String Type: SURF, Hole Size: 12.2 in., Size: 8.625 in., Top: 0 ft., Depth: 764 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 535, Top: 0 ft., Bottom: 764 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7761 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6176 ft., Bottom: 7761 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7761 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 6800 ft., Bottom: 6938 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4862 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 3806 ft., Bottom: 4884 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4310 ft. | | N | N | | NIOBRARA | 6892 ft. | | N | N | | FORT HAYS | 7141 ft. | | N | N | | CODELL | 7167 ft. | | N | N | | J SAND | 7604 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/8/2013 Interval Top: 7604 ft. Interval Bottom: 7652 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/16/2012 | | Treatment Summary: | JSAND 7604-7652 HOLES 74 SIZE .35
3/16/2012 drill CIBP to 7705
3/28/2012 commingle SX/NB/CD/JS | | Formation Treatment | | Treatment Date: | 2/1/2010 | | Treatment Summary: | SET CIBP @ 6760' W/ 2 SX CMT FOR MECHANICAL INTEGRITY. OUT INTENT IS TO DRILL OUT PLUG AND CMT TO COMMINGLE THE WELL IN THE NEXT SIX MONTHS. // FRAC'D J SAND W/ 500340# 20/40; 207312 GALLONS GELLED FLUID | | Formation Treatment | | Treatment Date: | 3/13/2006 | | Treatment Summary: | 3612 GALS FLUID & 2000 LBS 20/40 SAND NOTE: RAN FOR THE PURPOSE OF SAND CONTROL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 106500 | | CALC_MCF_GAS | 213 | | CASING_PRESS | 400 | | GRAVITY_OIL | 60 | | MCF_GAS | 213 | | TUBING_PRESS | 230 |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 74 | | Interval Bottom: | 7652 ft. | Hole Size: | 0.35 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/10/2005 Interval Top: 7168 ft. Interval Bottom: 7184 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.141 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2002 | | Treatment Summary: | 152662 GAL FLUID FRAC INFO REPRESENTS; CODL 102280 LBS 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7134 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/10/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 34 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 4450 | | CALC_MCF_GAS | 151 | | CASING_PRESS | 423 | | GRAVITY_OIL | 58 | | MCF_GAS | 151 | | TUBING_PRESS | 285 |
| | Perforation Data: | | Interval Top: | 7168 ft. | # Of Holes: | 48 | | Interval Bottom: | 7184 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/16/2008 Interval Top: 6938 ft. Interval Bottom: 7652 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/29/2008 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/21/2008 | | Treatment Summary: | DRILL OUTCIBP, COMMINGLE JNBCD. NBRR PERFS 4/12/07> 6938-6954 (3SPF) 7030-7050 (1SPF) CODL PERFS 3/16/05> 7168-7184 (3 SPF) JSND PERFS 8/9/02> 7604-7626 & 7637-7652 (2SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7561 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1228 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 7000 | | CALC_MCF_GAS | 21 | | CASING_PRESS | 600 | | GRAVITY_OIL | 48 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 6938 ft. | # Of Holes: | 190 | | Interval Bottom: | 7652 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/8/2013 Interval Top: 6938 ft. Interval Bottom: 7184 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/16/2012 | | Treatment Summary: | NIOBRARA PERF 6938-7050 HOLES 68
CODELL 7168-7184 HOLES 48 SIZE .38
3/16/2012 drill CIBP to 7705
3/28/2012 commingle SX/NB/CD/JS
| | Formation Treatment | | Treatment Date: | 2/1/2010 | | Treatment Summary: | SET CIBP@6760 W/2 SX CMT FOR MECHANICAL INTEGRITY. OUT INTENT IS TO DRILL OUT PLUG AND CMT TO COMMINGLE THE WELL IN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6938 ft. | # Of Holes: | 116 | | Interval Bottom: | 7184 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/31/2007 Interval Top: 6938 ft. Interval Bottom: 7050 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/30/2007 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/17/2007 | | Treatment Summary: | PERF & FRAC NBRR W/ 163,494 GALS FLUID & 250,280# 30/50 SAND 6938-6954 (3SPF) 7030-7050 (1SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6915 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1208 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 33500 | | CALC_MCF_GAS | 134 | | CASING_PRESS | 280 | | GRAVITY_OIL | 54 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 6938 ft. | # Of Holes: | 68 | | Interval Bottom: | 7050 ft. | Hole Size: | 0.42 in. |
|
Formation JNCSX Formation Classification: GW Status: CM - 4/3/2012 Interval Top: 4488 ft. Interval Bottom: 7652 ft.| Completed Information for Formation J-CODELL-NIOBRARA-SUSSEX | | 1st Production Date: | 3/28/2012 | Choke Size: | 0.000 in. | | Formation Name: | J-CODELL-NIOBRARA-SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2012 | | Treatment Summary: | SUSSEX PERF 4488-4512 HOLES 72 SIZE .38
NIOBRARA PERF 6938-7050 HOLES 68
CODELL 7168-7184 HOLES 48 SIZE .38
JSAND 7604-7652 HOLES 74 SIZE .35
3/16/2012 drill CIBP to 7705
3/28/2012 commingle SX/NB/CD/JS
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7654 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | BTU_GAS | 1203 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 3500 | | CALC_MCF_GAS | 7 | | CASING_PRESS | 553 | | GRAVITY_OIL | 55 | | MCF_GAS | 7 | | TUBING_PRESS | 517 |
| | Perforation Data: | | Interval Top: | 4488 ft. | # Of Holes: | 262 | | Interval Bottom: | 7652 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 10/12/2017 Interval Top: 4488 ft. Interval Bottom: 4512 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 3/16/2010 | Choke Size: | 0.375 in. | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2010 | | Treatment Summary: | FRAC W/ 19,488 GAL THERMOSTAR W/ 180,200# 12/20 & 20,400# 20/40 SB EXCEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4467 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1177 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 227000 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 448 | | GRAVITY_OIL | 50 | | TUBING_PRESS | 273 |
| | Perforation Data: | | Interval Top: | 4488 ft. | # Of Holes: | 72 | | Interval Bottom: | 4512 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/24/2012| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/12/2002 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 12500 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 463 | | GRAVITY_OIL | 51 | | MCF_GAS | 50 | | TUBING_PRESS | 427 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/12/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|