|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/28/2020 Measured TD: 7790 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/28/2020 | | Wellbore Permit | | | Permit #: | 20020851 | Expiration Date: | 5/15/2003 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 6/14/2002 | | Spud Date: | 5/23/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7790 ft. | Measured PB depth: | 7760 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DENSITY, INDUCTION, MICROLOG, CBL. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 656 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 505, Top: 0 ft., Bottom: 656 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7784 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6606 ft., Bottom: 7784 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7784 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3110 ft., Bottom: 4824 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4384 ft. | | N | N | | NIOBRARA | 7131 ft. | | N | N | | CODELL | 7188 ft. | | N | N | | J SAND | 7643 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/28/2020 Interval Top: 7656 ft. Interval Bottom: 7706 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/14/2002 | | Treatment Summary: | 177,870 GALS & 450,280 # 20/40 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7623 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 85000 | | CALC_MCF_GAS | 170 | | CASING_PRESS | 450 | | MCF_GAS | 170 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7656 ft. | # Of Holes: | 88 | | Interval Bottom: | 7706 ft. | Hole Size: | 0.3 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/28/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|