Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20180
Well Classification: GW Status: PA - 10/18/2017
Well Name/No:DODERO #3-4A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/18/2017
FacilityID:258608LocationID:331113
Municipality/County:FIRESTONE / WELD #123Location:NENW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4874 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:501FNL  2147 FWLLat/Long: 40.173596 / -104.896904Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.173670 / -104.896680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/18/2017             Measured TD: 7986 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/18/2017
Wellbore PermitDRIFTED
Permit #:20088662 Expiration Date:1/20/2010
Proposed Depth/Form:7986 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 636 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 445, Top: 0 ft., Bottom: 636 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 6536 ft., Bottom: 7962 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5244 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3720 ft., Bottom: 5247 ft.

Wellbore Completed
Completion Date:2/2/2001
Spud Date:1/20/2001Spud Date Is:ACTUAL
Measured TD:7986 ft.Measured PB depth:7931 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DILCGR, CNLDGR, MGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 636 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 0 ft., Bottom: 636 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 6532 ft., Bottom: 7962 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5244 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3728 ft., Bottom: 5247 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5244 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3726 ft., Bottom: 5246 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4528 ft.NN
SHANNON4808 ft.NN
NIOBRARA7140 ft.NN
FORT HAYS7362 ft.NN
CODELL7385 ft.NN
J SAND7816 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/18/2017                Interval Top: 7835 ft.    Interval Bottom: 7868 ft.

 Completed Information for Formation J SAND
1st Production Date:2/7/2001Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2012
Treatment Summary:PERF JSND 7835-7868 HOLES 54 SIZE .38 3/15/12 -DRILLED SAND PLUG OUT TO COMMINGLE JSND WITH NB-CD PRODUCTION 3/21/12 -J-NIOBRARA-CODELL COMMINGLED
Formation Treatment
Treatment Date:2/2/2001
Treatment Summary:12/14/2009-SET SAND PLUG @ 7535' TO MAINTAIN MECHANICAL INTEGRITY IN WELL. THANK YOU.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 7
CALC_BBLS_OIL 7
CALC_GOR 95429
CALC_MCF_GAS 668
CASING_PRESS 480
GRAVITY_OIL 60
MCF_GAS 668
TUBING_PRESS 340
Perforation Data:
Interval Top:7835 ft.# Of Holes:54
Interval Bottom:7868 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/23/2012                 Interval Top: 7386 ft.    Interval Bottom: 7402 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:203,070 GAL SW W/ 150,780# 40/70 & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7386 ft.# Of Holes:64
Interval Bottom:7402 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 3/23/2012                 Interval Top: 7150 ft.    Interval Bottom: 7868 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/21/2012Choke Size:0.000 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2012
Treatment Summary:PERF NBRR 7150-7280 HOLES 66 SIZE .42 PERF CODL 7386-7402 HOLES 64 SIZE .38 PERF JSND 7835-7868 HOLES 54 SIZE .38
Tubing Size:2.375 in.Tubing Setting Depth:7796 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/23/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1260
CALC_BBLS_OIL 2
CALC_GOR 11500
CALC_MCF_GAS 23
CASING_PRESS 852
GRAVITY_OIL 52
MCF_GAS 23
TUBING_PRESS 812
Perforation Data:
Interval Top:7150 ft.# Of Holes:184
Interval Bottom:7868 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/18/2017                Interval Top: 7150 ft.    Interval Bottom: 7402 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/8/2010Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2001
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1222
CALC_BBLS_H2O 0
CALC_BBLS_OIL 44
CALC_GOR 3182
CALC_MCF_GAS 140
CASING_PRESS 310
GRAVITY_OIL 48
TUBING_PRESS 290
Perforation Data:
Interval Top:7150 ft.# Of Holes:130
Interval Bottom:7402 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/23/2012                 Interval Top: 7150 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/18/2009
Treatment Summary:500 GAL 15% HC1 & 241,290 GAL SW W/ 200,250# 40/70 & 4000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7150 ft.# Of Holes:66
Interval Bottom:7280 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/18/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No