Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19957
Well Classification: GW Status: PA - 10/29/2025
Well Name/No:IONE #44-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/29/2025
FacilityID:257086LocationID:330969
County:WELD #123Location:SESE 10 2N66W 6
Field:WATTENBERG - #90750Elevation:5017 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  643 FELLat/Long: 40.146577 / -104.756259Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.146682 / -104.756123Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/29/2025             Measured TD: 8177 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/29/2025
Wellbore Permit
Permit #:20020361 Expiration Date:2/24/2003
Proposed Depth/Form:8070 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4200 ft., Bottom: 4900 ft.

Wellbore Completed
Completion Date:6/8/2000
Spud Date:5/10/2000Spud Date Is:ACTUAL
Measured TD:8177 ft.Measured PB depth:8153 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:COMP NEUT,LITH DENS; MICRO LOG GR,AIW/LD/CBL GR CCL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 935 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: 0 ft., Bottom: 935 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8173 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6820 ft., Bottom: 8173 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4964 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4000 ft., Bottom: 4964 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4964 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4000 ft., Bottom: 4964 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4488 ft.NN
SHANNON5130 ft.NN
NIOBRARA7202 ft.NN
FORT HAYS7456 ft.NN
CODELL7480 ft.NN
CARLILE7500 ft.NN
GREENHORN7544 ft.NN
BENTONITE7750 ft.NN
GRANEROS7751 ft.NN
MOWRY7901 ft.NN
J-2 SAND7917 ft.NN
SKULL CREEK8032 ft.NN
DAKOTA8118 ft.NN
LYTLE8170 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 10/19/2000                Interval Top: 8121 ft.    Interval Bottom: 8129 ft.

 Completed Information for Formation DAKOTA
1st Production Date:7/29/2000Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:PLUNGER LIFT
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2000
Treatment Summary:FRAC WELL W/12620# 100 MESH, 1/2 PPG, 1PPG, 71300# 20/40 FRAC SAND, 1PPG THRU 4 PPG. 118400# PR-6000 20/40 @ 5 PP IN 51240 GAL VISTAR 22 LHT/22/20 CROSSLINKED GEL.
Tubing Size:2.375 in.Tubing Setting Depth:8101 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2000Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 2
CALC_GOR 7500
CASING_PRESS 430
MCF_GAS 15
TUBING_PRESS 230
Perforation Data:
Interval Top:8121 ft.# Of Holes:48
Interval Bottom:8129 ft.Hole Size:0.41 in.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/29/2025                Interval Top: 7946 ft.    Interval Bottom: 7976 ft.

 Completed Information for Formation J SAND
1st Production Date:11/2/2000Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2000
Treatment Summary:FRAC WELL WITH 553100# 20/40 FRAC SAND IN 219876 GALS FRAC GEL 27# & 25#. 1 PPG THRU 5 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 42
BBLS_OIL 11
CALC_GOR 45727
CASING_PRESS 490
MCF_GAS 503
TUBING_PRESS 320
Perforation Data:
Interval Top:7946 ft.# Of Holes:60
Interval Bottom:7976 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/20/2002                Interval Top: 7485 ft.    Interval Bottom: 7976 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2000
Treatment Summary:RELEASE RBP. RIH W/ PROD TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7939 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/20/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 4
CALC_BBLS_H2O 14
CALC_BBLS_OIL 4
CALC_GOR 147000
CALC_MCF_GAS 588
CASING_PRESS 680
MCF_GAS 588
TUBING_PRESS 480
Perforation Data:
Interval Top:7485 ft.# Of Holes:108
Interval Bottom:7976 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/8/2025                  Interval Top: 7482 ft.    Interval Bottom: 7498 ft.

 Completed Information for Formation CODELL
1st Production Date:4/7/2002Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2009
Treatment Summary:3/28/2002 - PERF 7485 - 7495 WITH 40 HOLES, 3/23/2009 reperf 7482 - 7498 with 64 holes
Formation Treatment
Treatment Date:6/8/2000
Treatment Summary:SE W/RBP @ 7580'. PERF CODELL FROM 7485'-7495' W/4 SPF. FRAC W/319,467# 20/40 FRAC SAND. FLOW BACK. RUN PROD TBG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 35
CALC_GOR 3086
CASING_PRESS 250
MCF_GAS 108
Perforation Data:
Interval Top:7482 ft.# Of Holes:104
Interval Bottom:7498 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/9/2009                  Interval Top: 7250 ft.    Interval Bottom: 7976 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2000
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7360' 04-02-09. DRILLED OUT CBP @ 7540' TO COMMINGLE THE JSND-NBRR-CDL. 04-05-09
Tubing Size:2.375 in.Tubing Setting Depth:7220 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 8
BTU_GAS 1331
CALC_BBLS_H2O 2
CALC_BBLS_OIL 8
CALC_GOR 17500
CALC_MCF_GAS 140
CASING_PRESS 513
GRAVITY_OIL 50
MCF_GAS 140
TUBING_PRESS 180
Perforation Data:
Interval Top:7250 ft.# Of Holes:204
Interval Bottom:7976 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/29/2025                Interval Top: 7250 ft.    Interval Bottom: 7498 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/5/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/22/2009
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION SET CBP @ 7540'. 03-02-09. RE-FRAC'D THE CODELL WITH 109,200 GAL 28# TO 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,000# 20/40 SAND. 03-22-09 SET CFP @ 7360'. 03-22-09. FRAC'D THE NIOBRARA WITH 157,962 GAL 20# TO 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 250,020# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7250 ft.# Of Holes:184
Interval Bottom:7498 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/20/2025                 Interval Top: 7250 ft.    Interval Bottom: 7270 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7250 ft.# Of Holes:80
Interval Bottom:7270 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/29/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No