Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19749
Well Classification: GW Status: PA - 8/8/2025
Well Name/No:IONE #43-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/8/2025
FacilityID:89444LocationID:330844
County:WELD #123Location:NESE 10 2N66W 6
Field:WATTENBERG - #90750Elevation:5030 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2140FSL  662 FELLat/Long: 40.151197 / -104.756279Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.151343 / -104.756155Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/8/2012
End Date: 2/8/2012
Reported: 6/28/2012
Prior to rule 205A.b.(2)(A)
Days to report: 141
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/8/2025             Measured TD: 8171 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/8/2025
Wellbore Permit
Permit #:Expiration Date:1/23/2002
Proposed Depth/Form:8171 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4200 ft., Bottom: 4900 ft.

Wellbore Completed
Completion Date:8/22/2000
Spud Date:7/19/2000Spud Date Is:ACTUAL
Measured TD:8171 ft.Measured PB depth:8156 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP DENS, COMP NEU GR, DUAL IND GL GR, CBL GR.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8169 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6700 ft., Bottom: 8169 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5013 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 4140 ft., Bottom: 5013 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4482 ft.NN
SHANNON5138 ft.NN
NIOBRARA7237 ft.NN
CODELL7476 ft.NN
CARLILE7494 ft.NN
GREENHORN7538 ft.NN
BENTONITE7753 ft.NN
GRANEROS7754 ft.NN
MOWRY7908 ft.NN
J-2 SAND7934 ft.NN
SKULL CREEK8037 ft.NN
DAKOTA8123 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/8/2025                  Interval Top: 7936 ft.    Interval Bottom: 7988 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 2
CALC_BBLS_H2O 33
CALC_BBLS_OIL 2
CALC_GOR 159500
CALC_MCF_GAS 319
CASING_PRESS 430
MCF_GAS 319
TUBING_PRESS 230
Perforation Data:
Interval Top:7936 ft.# Of Holes:88
Interval Bottom:7988 ft.Hole Size:

Formation CODL                     Formation Classification:  OG                     Status:  CM - 5/30/2012                 Interval Top: 7478 ft.    Interval Bottom: 7497 ft.

 Completed Information for Formation CODELL
1st Production Date:10/22/2001Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2012
Treatment Summary:Set CIBP @ 7530 on 2/8/12; drilled out 3/29/12. Frac 7478-7494 w/ 115,778 gal frac fluid and 221,652 # sand. (2/8/12)
Formation Treatment
Treatment Date:8/22/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 20
CALC_BBLS_H2O 3
CALC_BBLS_OIL 20
CALC_GOR 1800
CALC_MCF_GAS 34
MCF_GAS 36
Perforation Data:
Interval Top:7478 ft.# Of Holes:64
Interval Bottom:7497 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/25/2002                 Interval Top: 7478 ft.    Interval Bottom: 7988 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2000
Treatment Summary:DRILL OUT CIBP. TIH W/PROD TBG. FLOW WELL BACK
Tubing Size:2.375 in.Tubing Setting Depth:7928 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 14
CALC_BBLS_H2O 2
CALC_BBLS_OIL 14
CALC_GOR 9681
CALC_MCF_GAS 131
CASING_PRESS 1050
MCF_GAS 131
TUBING_PRESS 600
Perforation Data:
Interval Top:7478 ft.# Of Holes:120
Interval Bottom:7988 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/8/2025                  Interval Top: 7280 ft.    Interval Bottom: 7494 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/2/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/20/2009
Treatment Summary:NB-CD REFRAC & RECOMPLETE: SET CBP @7560'. 3/18/09. REFRAC'D CODL W/109,200 GAL 28# TO 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,020# 20/40 SAND. 3/19/09. SET CFP @ 7400' 3/19/09. (SEE OPER'S COMMENTS-NEXT PAGE-FOR REMAINDER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7280 ft.# Of Holes:100
Interval Bottom:7494 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 5/30/2012                 Interval Top: 7275 ft.    Interval Bottom: 7988 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/23/2000Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2000
Treatment Summary:NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7400' AND CBP @ 7650' TO COMMINGLE THE JSND-NBRR-CODL. 4/2/09.
Tubing Size:2.375 in.Tubing Setting Depth:7920 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2012Test Method:Flow
Hours Tested:6Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 17
BTU_GAS 1
CALC_BBLS_H2O 4
CALC_BBLS_OIL 68
CALC_GOR 9470
CALC_MCF_GAS 644
CASING_PRESS 785
GRAVITY_OIL 59
MCF_GAS 161
TUBING_PRESS 603
Perforation Data:
Interval Top:7275 ft.# Of Holes:248
Interval Bottom:7988 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 10/23/2012                Interval Top: 7275 ft.    Interval Bottom: 7295 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/29/2012
Treatment Summary:Re-perf Niobrara 7275-7280, 7290-7295, 4 spf, 40 shots. Frac w/130,229 gal frac fluid and 244,950 # sand. (2/29/12)
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7275 ft.# Of Holes:80
Interval Bottom:7295 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/08/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No