Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17902
Well Classification: GW Status: SI - 6/1/2025
Well Name/No:DINNER E UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2025
FacilityID:250099LocationID:332746
County:WELD #123Location:SWSE 14 4N66W 6
Field:WATTENBERG - #90750Elevation:4719 ft.
Planned Location:680FSL  1900 FELLat/Long: 40.306376 / -104.741830Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.306535 / -104.741738Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2025             Measured TD: 8026 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2025
Wellbore Permit
Permit #:20032403 Expiration Date:12/18/2004
Proposed Depth/Form:8026 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 385 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 385 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8012 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 6192 ft., Bottom: 8012 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4760 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 550, Top: 3670 ft., Bottom: 4760 ft.

Wellbore Completed
Completion Date:3/7/1994
Spud Date:1/12/1994Spud Date Is:ACTUAL
Measured TD:8026 ft.Measured PB depth:7980 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 385 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 270, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8012 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4140 ft.
BENTONITE4483 ft.
SHANNON4806 ft.
NIOBRARA6866 ft.
FORT HAYS7176 ft.
CODELL7198 ft.
GREENHORN7226 ft.
J SAND7666 ft.
DAKOTA7880 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 6/1/2025                  Interval Top: 7666 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J SAND
1st Production Date:3/7/1994Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7666 ft.# Of Holes:
Interval Bottom:7738 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/26/2004                 Interval Top: 6900 ft.    Interval Bottom: 7120 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:SET CBP @ 7170'. PERF'D THE NIOBRARA FROM 6900' - 6930', 7100' - 7130' W/2 SPF. FRAC'D W/134,000 GAL FRAC FLUID AND 200,040# 20/40 SAND. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 3
CALC_BBLS_H2O 3
CALC_BBLS_OIL 3
CALC_GOR 644
CALC_MCF_GAS 193
CASING_PRESS 220
MCF_GAS 193
Perforation Data:
Interval Top:6900 ft.# Of Holes:120
Interval Bottom:7120 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/23/2003                 Interval Top: 6889 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/23/2003Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:POOH W/TBG HYDROTEST BACK IN W/BIT & TBG. TAG SAND @7244'. DRILL OUT SAND AND CIBP. CIBP @ 7300'/ POOH W/TBG AND BIT. RIH W/PROD TBG. SWAB AND FLOW 35 BBL.
Tubing Size:2.375 in.Tubing Setting Depth:7635 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 3
CASING_PRESS 300
MCF_GAS 198
TUBING_PRESS 280
Perforation Data:
Interval Top:6889 ft.# Of Holes:
Interval Bottom:7738 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/10/2009                Interval Top: 6889 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CBP'S TO COMMINGLE THE JSND-NBRR-CDL. 11/06/09
Tubing Size:2.375 in.Tubing Setting Depth:7643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/10/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 10
BTU_GAS 1174
CALC_BBLS_H2O 20
CALC_BBLS_OIL 10
CALC_GOR 21000
CALC_MCF_GAS 210
CASING_PRESS 555
GRAVITY_OIL 65
MCF_GAS 210
TUBING_PRESS 140
Perforation Data:
Interval Top:6889 ft.# Of Holes:516
Interval Bottom:7738 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 6/1/2025                  Interval Top: 6889 ft.    Interval Bottom: 7218 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION - SET CBP @ 7265'. RE-FRAC'D THE CODELL WITH 250,640# 20/40 SAND IN 1946 BBLS VISTAR 28 SLF. STAGED SAND FROM 1# TO 5#. TOTAL GELLED FLUID-2842 BBLS. TOTAL FRAC FLUID-2878 BBLS. 10/04/09. SET CBP @ 7040'. 10/09/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 7
CALC_BBLS_H2O 3
CALC_BBLS_OIL 7
CALC_GOR 33000
CALC_MCF_GAS 231
CASING_PRESS 24
MCF_GAS 231
TUBING_PRESS 7
Perforation Data:
Interval Top:6889 ft.# Of Holes:220
Interval Bottom:7218 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)68
Total Gas Produced (MCF)5506
GOR80970
GOR DeterminationMCFE
Average BOE per Day2.816
Average MCFE per Day16.339

 Federal Financial Assurance  i 

 Tribal Well  i No