Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17902
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:DINNER E UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:250099LocationID:332746
County:WELD #123Location:SWSE 14 4N66W 6
Field:WATTENBERG - #90750Elevation:4719 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:680FSL  1900 FELLat/Long: 40.306376 / -104.741830Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.306535 / -104.741738Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 8026 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore Permit
Permit #:20032403 Expiration Date:12/18/2004
Proposed Depth/Form:8026 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 385 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 385 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8012 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 6192 ft., Bottom: 8012 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4760 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 550, Top: 3670 ft., Bottom: 4760 ft.

Wellbore Completed
Completion Date:3/7/1994
Spud Date:1/12/1994Spud Date Is:ACTUAL
Measured TD:8026 ft.Measured PB depth:7980 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 385 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 270, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8012 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4140 ft.
BENTONITE4483 ft.
SHANNON4806 ft.
NIOBRARA6866 ft.
FORT HAYS7176 ft.
CODELL7198 ft.
GREENHORN7226 ft.
J SAND7666 ft.
DAKOTA7880 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 7666 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J SAND
1st Production Date:3/7/1994Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7666 ft.# Of Holes:
Interval Bottom:7738 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/26/2004                 Interval Top: 6900 ft.    Interval Bottom: 7120 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:SET CBP @ 7170'. PERF'D THE NIOBRARA FROM 6900' - 6930', 7100' - 7130' W/2 SPF. FRAC'D W/134,000 GAL FRAC FLUID AND 200,040# 20/40 SAND. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 3
CALC_BBLS_H2O 3
CALC_BBLS_OIL 3
CALC_GOR 644
CALC_MCF_GAS 193
CASING_PRESS 220
MCF_GAS 193
Perforation Data:
Interval Top:6900 ft.# Of Holes:120
Interval Bottom:7120 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/23/2003                 Interval Top: 6889 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/23/2003Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:POOH W/TBG HYDROTEST BACK IN W/BIT & TBG. TAG SAND @7244'. DRILL OUT SAND AND CIBP. CIBP @ 7300'/ POOH W/TBG AND BIT. RIH W/PROD TBG. SWAB AND FLOW 35 BBL.
Tubing Size:2.375 in.Tubing Setting Depth:7635 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 3
CASING_PRESS 300
MCF_GAS 198
TUBING_PRESS 280
Perforation Data:
Interval Top:6889 ft.# Of Holes:
Interval Bottom:7738 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/10/2009                Interval Top: 6889 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CBP'S TO COMMINGLE THE JSND-NBRR-CDL. 11/06/09
Tubing Size:2.375 in.Tubing Setting Depth:7643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/10/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 10
BTU_GAS 1174
CALC_BBLS_H2O 20
CALC_BBLS_OIL 10
CALC_GOR 21000
CALC_MCF_GAS 210
CASING_PRESS 555
GRAVITY_OIL 65
MCF_GAS 210
TUBING_PRESS 140
Perforation Data:
Interval Top:6889 ft.# Of Holes:516
Interval Bottom:7738 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 8/1/2025                  Interval Top: 6889 ft.    Interval Bottom: 7218 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/1994
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION - SET CBP @ 7265'. RE-FRAC'D THE CODELL WITH 250,640# 20/40 SAND IN 1946 BBLS VISTAR 28 SLF. STAGED SAND FROM 1# TO 5#. TOTAL GELLED FLUID-2842 BBLS. TOTAL FRAC FLUID-2878 BBLS. 10/04/09. SET CBP @ 7040'. 10/09/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 7
CALC_BBLS_H2O 3
CALC_BBLS_OIL 7
CALC_GOR 33000
CALC_MCF_GAS 231
CASING_PRESS 24
MCF_GAS 231
TUBING_PRESS 7
Perforation Data:
Interval Top:6889 ft.# Of Holes:220
Interval Bottom:7218 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)68
Total Gas Produced (MCF)5465
GOR80367
GOR DeterminationMCFE
Average BOE per Day2.792
Average MCFE per Day16.198

 Federal Financial Assurance  i 

 Tribal Well  i No