Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17602
Well Classification: GW Status: PA - 3/29/2023
Well Name/No:WARDELL 7A #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/29/2023
FacilityID:249799LocationID:332623
County:WELD #123Location:NESE 7 3N65W 6
Field:WATTENBERG - #90750Elevation:4956 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1983FSL  653 FELLat/Long: 40.238017 / -104.699148Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.237500 / -104.699830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/29/2023             Measured TD: 7930 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/29/2023
Wellbore PermitDRIFTED
Permit #:20032443 Expiration Date:12/28/2004
Proposed Depth/Form:7930 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:9/30/2000
Spud Date:12/3/1993Spud Date Is:ACTUAL
Measured TD:7930 ft.Measured PB depth:7881 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, NGT, CDL, & CBL
Log Types:COMP. DENSITY,COMP. NEUTRON GR; INDUCTON SP GR; CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 586 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 586 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7450 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 6340 ft., Bottom: 7450 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5142 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 3704 ft., Bottom: 5142 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7360 ft., Depth: 7930 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 7360 ft., Bottom: 7881 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4304 ft.NN
BENTONITE4652 ft.NN
NIOBRARA7056 ft.NN
FORT HAYS7294 ft.NN
CODELL7317 ft.NN
GREENHORN7330 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/29/2023                 Interval Top: 7785 ft.    Interval Bottom: 7814 ft.

 Completed Information for Formation J SAND
1st Production Date:10/1/2000Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/30/2000
Treatment Summary:FRAC JSND W/ 551,260# 20/40 FRAC SAND, 1 PPG THRU 5 PPG, IN 195,740 GALS FRAC GEL 27# HT & 25#
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7785 ft.# Of Holes:116
Interval Bottom:7814 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/19/2022                Interval Top: 7310 ft.    Interval Bottom: 7331 ft.

 Completed Information for Formation CODELL
1st Production Date:1/1/1994Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7310 ft.# Of Holes:40
Interval Bottom:7331 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/30/2004                 Interval Top: 7080 ft.    Interval Bottom: 7814 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/30/2000Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:10/30/2000
Treatment Summary:FRAC J SAND WITH 551,260# 20/40 FRAC SAND, 1 PPG THRU 5 PPG, IN 195,740 GALS FRAC GEL 27# HT & 25#
Formation Treatment
Treatment Date:9/30/2000
Treatment Summary:JSND-NB-CD COMMINGLE REMOVED RBP @ 7290' TO COMMINGLE THE JSND-NB-CD ON 05-10-04
Tubing Size:2.375 in.Tubing Setting Depth:7373 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2004Test Method:FLOWING
Hours Tested:20Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 3
CALC_BBLS_H2O 4
CALC_BBLS_OIL 3
CALC_GOR 80000
CALC_MCF_GAS 240
CASING_PRESS 540
MCF_GAS 240
TUBING_PRESS 340
Perforation Data:
Interval Top:7080 ft.# Of Holes:872
Interval Bottom:7814 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/29/2023                 Interval Top: 7080 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/1/1994Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/3/2010
Treatment Summary:NIOBRARA - REFRACD 7080-7260 WITH 149604 GAL FRAC FLUID AND 251080# SAND CODELL - REFRAC'D 7310-7330 WITH 122,640 GAL FRAC FLUID AND 250,820# SAND
Formation Treatment
Treatment Date:4/15/2004
Treatment Summary:NB-CD RECOMPLETION SET RBP @ 7290'. 04-09-04 FRAC'D THE NIOBRARA- 7100-7130', 7230-7260' W/ 135,300 GAL FRAC FLUID AND 201,260# SAND. 04-12-04 FRAC'D THE NIOBRARA-7200-7225' AND THE CODELL 7310-7331' W/ 592,000# 20/40 SAND IN 170,600 GAL GEL 12-23-93 FRAC'D THE NIOBRARA-CODELL 7080-7331' W/ 300,300# 20/40 FRAC SAND AND 107,486 GALS SILVERSTIM FRAC FLUID. 12-16-02
Formation Treatment
Treatment Date:1/11/1994
Treatment Summary:7056' TO 7260' ACIDIZE NBRR W/ 2,500 GALLONS 10% HCL 7200' TO 7331' FRAC W/ 592,000# 20/40 SAND IN 170,600 GALLONS GEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 5
BTU_GAS 1272
CALC_BBLS_H2O 45
CALC_BBLS_OIL 15
CALC_GOR 140000
CALC_MCF_GAS 600
CASING_PRESS 687
GRAVITY_OIL 64
MCF_GAS 200
TUBING_PRESS 606
Perforation Data:
Interval Top:7080 ft.# Of Holes:756
Interval Bottom:7330 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/19/2022                Interval Top: 7080 ft.    Interval Bottom: 7260 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/1/1994Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7080 ft.# Of Holes:360
Interval Bottom:7260 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/29/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No